Construction process of downstream face structure containing FS101 waterproof mortar
The invention discloses a construction process of a downstream face structure containing FS101 waterproof mortar. The construction process comprises the following steps that a leveling layer is arranged on the outer side of a side wall to level the side wall, wherein the flatness of the leveling layer is not less than 0.1 mm; a dredging layer is arranged on the outer side of the leveling layer, the dredging layer is provided with first drainage channels and second drainage channels, and the first drainage channels communicate with the second drainage channels located on the side portion; geotechnical cloth is arranged on the outer side of the dredging layer; the waterproof mortar is evenly sprayed to the surface of the geotechnical cloth to form a waterproof mortar layer, wherein the waterproof mortar contains a FS101 mortar waterproof agent, and the mass ratio of the FS101 mortar waterproof agent is not lower than 3%; and a thermal insulation layer is arranged on the outer side of the waterproof mortar layer, and a surface layer is arranged on the outer side of the thermal insulation layer. According to the construction process of the downstream face structure containing the FS101 waterproof mortar, the structure is reasonable, construction is rapid, and the arranged dredging layer can dredge accumulated water in time so as to guarantee the waterproof effect of a downstream face.
本发明公开了一种含有FS101防水砂浆背水面构造的施工工艺,其包括:在侧墙的外侧设置找平层以将其找平处理,找平层的平面度不低于0.1mm;在找平层的外侧设置疏导层,疏导层配置有第一疏水通道和第二疏水通道,第一疏水通道与位于侧部的第二疏水通道相连通;将土工布设置于所述疏导层的外侧;将防水砂浆均匀喷涂于所述土工布的表面形成防水砂浆层,防水砂浆含有FS101砂浆防水剂,FS101砂浆防水剂的质量比不低于3%;在防水砂浆层的外侧设置保温层,在所述保温层的外侧设置表皮层。本发明提供的一种含有FS101防水砂浆背水面构造的施工工艺,其结构合理,施工快捷,设置的疏导层能够将聚集的水分及时疏导,以保证背水面的防水效果。
Construction process of downstream face structure containing FS101 waterproof mortar
The invention discloses a construction process of a downstream face structure containing FS101 waterproof mortar. The construction process comprises the following steps that a leveling layer is arranged on the outer side of a side wall to level the side wall, wherein the flatness of the leveling layer is not less than 0.1 mm; a dredging layer is arranged on the outer side of the leveling layer, the dredging layer is provided with first drainage channels and second drainage channels, and the first drainage channels communicate with the second drainage channels located on the side portion; geotechnical cloth is arranged on the outer side of the dredging layer; the waterproof mortar is evenly sprayed to the surface of the geotechnical cloth to form a waterproof mortar layer, wherein the waterproof mortar contains a FS101 mortar waterproof agent, and the mass ratio of the FS101 mortar waterproof agent is not lower than 3%; and a thermal insulation layer is arranged on the outer side of the waterproof mortar layer, and a surface layer is arranged on the outer side of the thermal insulation layer. According to the construction process of the downstream face structure containing the FS101 waterproof mortar, the structure is reasonable, construction is rapid, and the arranged dredging layer can dredge accumulated water in time so as to guarantee the waterproof effect of a downstream face.
本发明公开了一种含有FS101防水砂浆背水面构造的施工工艺,其包括:在侧墙的外侧设置找平层以将其找平处理,找平层的平面度不低于0.1mm;在找平层的外侧设置疏导层,疏导层配置有第一疏水通道和第二疏水通道,第一疏水通道与位于侧部的第二疏水通道相连通;将土工布设置于所述疏导层的外侧;将防水砂浆均匀喷涂于所述土工布的表面形成防水砂浆层,防水砂浆含有FS101砂浆防水剂,FS101砂浆防水剂的质量比不低于3%;在防水砂浆层的外侧设置保温层,在所述保温层的外侧设置表皮层。本发明提供的一种含有FS101防水砂浆背水面构造的施工工艺,其结构合理,施工快捷,设置的疏导层能够将聚集的水分及时疏导,以保证背水面的防水效果。
Construction process of downstream face structure containing FS101 waterproof mortar
一种含有FS101防水砂浆背水面构造的施工工艺
WANG CHENYUE (author)
2021-07-23
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2025
|Basement downstream face waterproof drainage structure and construction method
European Patent Office | 2020
|Construction process of structure containing FS101 multi-layer waterproof mortar
European Patent Office | 2021
|Phosphorus slag waterproof plastering mortar and mortar plastering waterproof construction method
European Patent Office | 2021
|European Patent Office | 2024
|