A platform for research: civil engineering, architecture and urbanism
Building construction formwork anti-toppling device and using method
The invention relates to the technical field of building construction equipment, in particular to a building construction formwork anti-toppling device and a using method. The using method of the building construction formwork anti-toppling device comprises the following steps that step 1, the building construction formwork anti-toppling device is arranged; step 2, the construction formwork slides into the device, and primary erection of the construction formwork is achieved; step 3, the construction formwork is accurately adjusted to the position, used for positioning the construction formwork, of the device; and step 4, the position of the construction formwork is adjusted, and erection of the construction formwork is completed. The building construction formwork anti-toppling device further comprises an auxiliary fixing assembly for fixing the bottom of the construction formwork in the erecting process of the construction formwork. The auxiliary fixing assembly comprises a bottom frame clamping plate, a plurality of grooves are formed in the bottom frame clamping plate, and a plurality of fixing frames are arranged on the left side face and the right side face of the bottom frame clamping plate. The protruding part of the bottom frame clamping plate is made of a hard rubber material.
本发明涉及建筑施工设备技术领域,更具体的说是一种建筑施工模板防倾倒装置及使用方法。一种建筑施工模板防倾倒装置的使用方法,该方法包括以下步骤:步骤一:设置所述建筑施工模板防倾倒装置;步骤二:将所述施工模板滑入到所述装置中,实现对施工模板的初步架设;步骤三:将施工模板精准调整至所述装置用于定位施工模板的位置;步骤四:对施工模板进行位置调整,完成施工模板架设。该装置还包括在对施工模板进行架设过程中对施工模板底部进行固定的辅助固定组件。所述的辅助固定组件包括底架夹持板,底架夹持板上设置有多个凹槽,底架夹持板的左右侧面设置有多个固定架。所述的底架夹持板突出部分采用硬质橡胶材料。
Building construction formwork anti-toppling device and using method
The invention relates to the technical field of building construction equipment, in particular to a building construction formwork anti-toppling device and a using method. The using method of the building construction formwork anti-toppling device comprises the following steps that step 1, the building construction formwork anti-toppling device is arranged; step 2, the construction formwork slides into the device, and primary erection of the construction formwork is achieved; step 3, the construction formwork is accurately adjusted to the position, used for positioning the construction formwork, of the device; and step 4, the position of the construction formwork is adjusted, and erection of the construction formwork is completed. The building construction formwork anti-toppling device further comprises an auxiliary fixing assembly for fixing the bottom of the construction formwork in the erecting process of the construction formwork. The auxiliary fixing assembly comprises a bottom frame clamping plate, a plurality of grooves are formed in the bottom frame clamping plate, and a plurality of fixing frames are arranged on the left side face and the right side face of the bottom frame clamping plate. The protruding part of the bottom frame clamping plate is made of a hard rubber material.
本发明涉及建筑施工设备技术领域,更具体的说是一种建筑施工模板防倾倒装置及使用方法。一种建筑施工模板防倾倒装置的使用方法,该方法包括以下步骤:步骤一:设置所述建筑施工模板防倾倒装置;步骤二:将所述施工模板滑入到所述装置中,实现对施工模板的初步架设;步骤三:将施工模板精准调整至所述装置用于定位施工模板的位置;步骤四:对施工模板进行位置调整,完成施工模板架设。该装置还包括在对施工模板进行架设过程中对施工模板底部进行固定的辅助固定组件。所述的辅助固定组件包括底架夹持板,底架夹持板上设置有多个凹槽,底架夹持板的左右侧面设置有多个固定架。所述的底架夹持板突出部分采用硬质橡胶材料。
Building construction formwork anti-toppling device and using method
一种建筑施工模板防倾倒装置及使用方法
WANG CHANGCAI (author)
2021-07-23
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building construction formwork anti-toppling device and using method
European Patent Office | 2022
|Anti-toppling scaffold for bridge road and building construction and construction method
European Patent Office | 2021
|Anti-toppling protection device for pavement construction
European Patent Office | 2024
|Anti-toppling scaffold for bridge road and building construction and construction method
European Patent Office | 2023
|