Double-track beam moving trolley system
The invention discloses a double-rail beam moving trolley system which comprises two steel rail slide ways. The two opposite sides of the steel rail slideways are of U-shaped groove structures, the two steel rail slideways are arranged at the top of the box culvert top plate in parallel, and the beam moving trolley is arranged at the tops of the two steel rail slideways and slides on the two steel rail slideways; protection mechanisms are arranged on the two opposite sides of the beam moving trolley; a sleeper cushion layer is arranged at the top of the beam moving trolley; an overhead cross beam is arranged at the top of the sleeper cushion layer; connecting mechanisms are arranged at the two opposite ends of the steel rail sliding ways. The two steel rail slideways are arranged at the top of the box culvert top plate and matched with the beam moving trolley, and the beam moving trolley rolls and travels on the steel rail slideways and can be used for moving loading equipment and can also be used for box bridge jacking sliding fulcrums and the like.In addition, short steel rails are adopted in the steel rail slideways, thereby facilitating manual movement of operators. The structure solves the problem that due to the limitation of working space, heavy components are inconvenient to operate by workers, operation is convenient, and time and labor are saved.
本发明公开了双轨移梁台车系统,包括钢轨滑道,钢轨滑道相对的两侧均呈U型槽结构设置,钢轨滑道设置有两个,两个钢轨滑道平行设置在箱涵顶板的顶部,两个钢轨滑道的顶部设有移梁台车,移梁台车在两个钢轨滑道上滑动,移梁台车相对的两侧均设有防护机构,移梁台车的顶部设有枕木垫层,枕木垫层的顶部设有架空横梁,钢轨滑道相对的两端设有连接机构,有益效果:箱涵顶板顶部的两个钢轨滑道,钢轨滑道与移梁台车配合,移梁台车在钢轨滑道上滚动走行,可用于移动载重设备,也可用于箱桥顶进滑动支点等,钢轨滑道采用短钢轨,便于作业人员人力移动,避免受作业空间限制采用笨重构件则不便于工人操作的问题,操作方便,省时省力。
Double-track beam moving trolley system
The invention discloses a double-rail beam moving trolley system which comprises two steel rail slide ways. The two opposite sides of the steel rail slideways are of U-shaped groove structures, the two steel rail slideways are arranged at the top of the box culvert top plate in parallel, and the beam moving trolley is arranged at the tops of the two steel rail slideways and slides on the two steel rail slideways; protection mechanisms are arranged on the two opposite sides of the beam moving trolley; a sleeper cushion layer is arranged at the top of the beam moving trolley; an overhead cross beam is arranged at the top of the sleeper cushion layer; connecting mechanisms are arranged at the two opposite ends of the steel rail sliding ways. The two steel rail slideways are arranged at the top of the box culvert top plate and matched with the beam moving trolley, and the beam moving trolley rolls and travels on the steel rail slideways and can be used for moving loading equipment and can also be used for box bridge jacking sliding fulcrums and the like.In addition, short steel rails are adopted in the steel rail slideways, thereby facilitating manual movement of operators. The structure solves the problem that due to the limitation of working space, heavy components are inconvenient to operate by workers, operation is convenient, and time and labor are saved.
本发明公开了双轨移梁台车系统,包括钢轨滑道,钢轨滑道相对的两侧均呈U型槽结构设置,钢轨滑道设置有两个,两个钢轨滑道平行设置在箱涵顶板的顶部,两个钢轨滑道的顶部设有移梁台车,移梁台车在两个钢轨滑道上滑动,移梁台车相对的两侧均设有防护机构,移梁台车的顶部设有枕木垫层,枕木垫层的顶部设有架空横梁,钢轨滑道相对的两端设有连接机构,有益效果:箱涵顶板顶部的两个钢轨滑道,钢轨滑道与移梁台车配合,移梁台车在钢轨滑道上滚动走行,可用于移动载重设备,也可用于箱桥顶进滑动支点等,钢轨滑道采用短钢轨,便于作业人员人力移动,避免受作业空间限制采用笨重构件则不便于工人操作的问题,操作方便,省时省力。
Double-track beam moving trolley system
双轨移梁台车系统
LIU HAILONG (author) / WANG LIFENG (author) / REN CUNPENG (author) / LI ZHIQIANG (author)
2021-07-30
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Transverse moving walking track of railway beam moving trolley
European Patent Office | 2021
|