A platform for research: civil engineering, architecture and urbanism
Construction method of merbau in riverway ecological engineering
The invention discloses a construction method ofmerbau in riverway ecological engineering, which comprises the following steps of: firstly, lofting a paving elevation control point at a to-be-constructed place, and rechecking; then, constructing a steel keel, so that the steel keel is fixedly connected with the concrete lintel, and the mounting position and the elevation of the steel keel are lofted; determining the elevation of the wooden keel according to the measured control points, and constructing and installing the wooden keel; performing preservative treatment on the merbau, mounting the merbau preservative wood subjected to the preservative treatment on the wood keel, and ensuring that each contact point of the pineapple lattice preservative wood and the wood keel is vertically fixed; secondly, installing handrails, and sealing the edges of a panel formed after the merbau preservative wood is installed; and finally, the exposed surface layer of the installed panel is subjected to facing treatment. The construction method is reliable in operation, convenient to construct, few in working procedures, free of special technical workers, high in overall construction efficiency, easy to guarantee the effect and long in service life.
本发明公开了一种菠萝格木在河道生态工程中的施工方法,包括以下步骤:首先对需施工处的铺装高程控制点进行放样,并进行复核;随后施作钢龙骨,使钢龙骨与混凝土过梁连接固定,并对钢龙骨的安装位置及高程进行放样;再根据测量的控制点,确定木龙骨的高程,并施工安装木龙骨;对菠萝格木进行防腐处理,将防腐处理后的菠萝格防腐木安装到木龙骨上,并保证菠萝格防腐木与木龙骨的每个接触点均垂直固定;再安装栏杆,并对菠萝格防腐木安装后形成的面板的边缘进行封边处理;最后对安装完成后的面板的露面层进行饰面处理;该施工方法操作可靠,施工便捷,工序少,无需特殊的技术工人,整体施工效率高且效果易于保证,使用寿命长。
Construction method of merbau in riverway ecological engineering
The invention discloses a construction method ofmerbau in riverway ecological engineering, which comprises the following steps of: firstly, lofting a paving elevation control point at a to-be-constructed place, and rechecking; then, constructing a steel keel, so that the steel keel is fixedly connected with the concrete lintel, and the mounting position and the elevation of the steel keel are lofted; determining the elevation of the wooden keel according to the measured control points, and constructing and installing the wooden keel; performing preservative treatment on the merbau, mounting the merbau preservative wood subjected to the preservative treatment on the wood keel, and ensuring that each contact point of the pineapple lattice preservative wood and the wood keel is vertically fixed; secondly, installing handrails, and sealing the edges of a panel formed after the merbau preservative wood is installed; and finally, the exposed surface layer of the installed panel is subjected to facing treatment. The construction method is reliable in operation, convenient to construct, few in working procedures, free of special technical workers, high in overall construction efficiency, easy to guarantee the effect and long in service life.
本发明公开了一种菠萝格木在河道生态工程中的施工方法,包括以下步骤:首先对需施工处的铺装高程控制点进行放样,并进行复核;随后施作钢龙骨,使钢龙骨与混凝土过梁连接固定,并对钢龙骨的安装位置及高程进行放样;再根据测量的控制点,确定木龙骨的高程,并施工安装木龙骨;对菠萝格木进行防腐处理,将防腐处理后的菠萝格防腐木安装到木龙骨上,并保证菠萝格防腐木与木龙骨的每个接触点均垂直固定;再安装栏杆,并对菠萝格防腐木安装后形成的面板的边缘进行封边处理;最后对安装完成后的面板的露面层进行饰面处理;该施工方法操作可靠,施工便捷,工序少,无需特殊的技术工人,整体施工效率高且效果易于保证,使用寿命长。
Construction method of merbau in riverway ecological engineering
一种菠萝格木在河道生态工程中的施工方法
LI RUIXIANG (author) / XING LIZHEN (author) / SHEN JIALI (author) / ZHANG ZHONG (author) / WANG ZELONG (author)
2021-08-03
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Riverway ecological chain protection slope construction method
European Patent Office | 2020
|Riverway ecological slope protection structure and construction method thereof
European Patent Office | 2021
|Ecological hydraulic engineering riverway landscape block structure
European Patent Office | 2015
|