A platform for research: civil engineering, architecture and urbanism
Formwork connecting structure and formwork frame
The invention provides a formwork connecting structure. The formwork connecting structure comprises a first connecting piece, a second connecting piece and a first fixing piece, and the first connecting piece is provided with a connecting hole and a first fixing hole which penetrates through the first connecting piece and communicates with the connecting hole; the second connecting piece is provided with a second fixing hole corresponding to the first fixing hole, and the second connecting piece is movably arranged in the connecting hole; and the first fixing piece is arranged in the first fixing hole and the second fixing hole. The invention further relates to a formwork frame. According to the scheme, the first connecting piece and the second connecting piece are detachably connected, so that after concrete is poured, the first connecting piece and the second connecting piece are conveniently pulled out from the two sides, the formwork piece is pulled out upwards, and therefore formwork removal is facilitated.
一种模板连接结构,包括第一连接件、第二连接件和第一固定件,所述第一连接件设有连接孔和贯穿所述第一连接件并连通所述连接孔的第一固定孔;第二连接件设有与第一固定孔相对应的第二固定孔,所述第二连接件可移动地设于所述连接孔内;第一固定件,设于所述第一固定孔和所述第二固定孔内。还涉及一种模板框架。上述方案通过将第一连接件和第二连接件可分离连接,以在浇注混凝土后,便于从两侧抽出第一连接件和第二连接件,并向上方抽出模板件,从而便于拆模。
Formwork connecting structure and formwork frame
The invention provides a formwork connecting structure. The formwork connecting structure comprises a first connecting piece, a second connecting piece and a first fixing piece, and the first connecting piece is provided with a connecting hole and a first fixing hole which penetrates through the first connecting piece and communicates with the connecting hole; the second connecting piece is provided with a second fixing hole corresponding to the first fixing hole, and the second connecting piece is movably arranged in the connecting hole; and the first fixing piece is arranged in the first fixing hole and the second fixing hole. The invention further relates to a formwork frame. According to the scheme, the first connecting piece and the second connecting piece are detachably connected, so that after concrete is poured, the first connecting piece and the second connecting piece are conveniently pulled out from the two sides, the formwork piece is pulled out upwards, and therefore formwork removal is facilitated.
一种模板连接结构,包括第一连接件、第二连接件和第一固定件,所述第一连接件设有连接孔和贯穿所述第一连接件并连通所述连接孔的第一固定孔;第二连接件设有与第一固定孔相对应的第二固定孔,所述第二连接件可移动地设于所述连接孔内;第一固定件,设于所述第一固定孔和所述第二固定孔内。还涉及一种模板框架。上述方案通过将第一连接件和第二连接件可分离连接,以在浇注混凝土后,便于从两侧抽出第一连接件和第二连接件,并向上方抽出模板件,从而便于拆模。
Formwork connecting structure and formwork frame
模板连接结构及模板框架
YUAN WANGXIAN (author) / LIU JIANCHUN (author) / ZENG ZHENG (author)
2021-08-03
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Haunching formwork, formwork frame and construction method of formwork frame
European Patent Office | 2023
|