A platform for research: civil engineering, architecture and urbanism
Grouting type prefabricated inspection well
The invention provides a grouting type prefabricated inspection well. The grouting type prefabricated inspection well comprises connecting devices, mounting structures, limiting structures and anti-settling devices; the number of the connecting devices is four, and the four connecting devices are of an annular structure after being formed; the number of the mounting structures is four, and the four mounting structures are mounted at the tops of the four connecting devices; the number of the limiting structures is four, and the four limiting structures are mounted at the bottoms of the four connecting devices; and the number of the anti-settling devices is eight, and the eight anti-settling devices are mounted in the four connecting devices. According to the grouting type prefabricated inspection well, the anti-settling devices are arranged, so that the inspection well is firmer after being mounted, the inspection well is prevented from inclining and settling after being used for a long time, five balls and five clamping grooves of a ball screw are arranged to be the same in size, bending of a supporting block during rotation is avoided, and when the outer wall of the supporting block makes contact with a prefabricated block, a mounting shaft and the ball screw are rotationally connected, the supporting block is prevented from being damaged, and the service life of the inspection well is prolonged.
本发明提供注浆式预制窨井,包括连接装置;所述连接装置共设有四组,且四组连接装置组成后为圆环形结构;所述安装结构共设有四组,且四组安装结构安装在四组连接装置的顶部;所述限位结构共设有四组,且四组限位结构安装在四组连接装置的底部;防沉降装置共设有八组,且八组防沉降装置安装在四组连接装置的内部,本发明防沉降装置的设置,使得装置在安装后更加牢固,避免了装置长时间使用发生歪斜和沉降,五个滚珠与滚珠丝杠的五个卡槽大小相同的设置,避免了支撑块在转动时发生折弯,当支撑块外壁与预制块接触时,安装轴和滚珠丝杠转动连接,避免了支撑块发生损坏,提高了装置的使用寿命。
Grouting type prefabricated inspection well
The invention provides a grouting type prefabricated inspection well. The grouting type prefabricated inspection well comprises connecting devices, mounting structures, limiting structures and anti-settling devices; the number of the connecting devices is four, and the four connecting devices are of an annular structure after being formed; the number of the mounting structures is four, and the four mounting structures are mounted at the tops of the four connecting devices; the number of the limiting structures is four, and the four limiting structures are mounted at the bottoms of the four connecting devices; and the number of the anti-settling devices is eight, and the eight anti-settling devices are mounted in the four connecting devices. According to the grouting type prefabricated inspection well, the anti-settling devices are arranged, so that the inspection well is firmer after being mounted, the inspection well is prevented from inclining and settling after being used for a long time, five balls and five clamping grooves of a ball screw are arranged to be the same in size, bending of a supporting block during rotation is avoided, and when the outer wall of the supporting block makes contact with a prefabricated block, a mounting shaft and the ball screw are rotationally connected, the supporting block is prevented from being damaged, and the service life of the inspection well is prolonged.
本发明提供注浆式预制窨井,包括连接装置;所述连接装置共设有四组,且四组连接装置组成后为圆环形结构;所述安装结构共设有四组,且四组安装结构安装在四组连接装置的顶部;所述限位结构共设有四组,且四组限位结构安装在四组连接装置的底部;防沉降装置共设有八组,且八组防沉降装置安装在四组连接装置的内部,本发明防沉降装置的设置,使得装置在安装后更加牢固,避免了装置长时间使用发生歪斜和沉降,五个滚珠与滚珠丝杠的五个卡槽大小相同的设置,避免了支撑块在转动时发生折弯,当支撑块外壁与预制块接触时,安装轴和滚珠丝杠转动连接,避免了支撑块发生损坏,提高了装置的使用寿命。
Grouting type prefabricated inspection well
注浆式预制窨井
LI HAIYANG (author) / ZHOU XIAOYAN (author)
2021-08-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|Grouting system of prefabricated building grouting sleeve
European Patent Office | 2024
|