Novel fabricated 0# block construction bracket with pre-pressing assembly
The invention discloses a novel fabricated 0# block construction bracket with a pre-pressing assembly, and belongs to the technical field of bridges. A lower counter-force beam assembly is arranged below an upper longitudinal beam assembly, and the pulleys are arranged on a lower counter-force beam assembly and a cable saddle assembly to change the direction of acting force; when a pre-pressing load piece is tensioned and loaded, the tensioning ends of the steel strands bear tensioning stress which is tensioned inwards along the top wall, the tensioning stress acts on the upper longitudinal beam assembly through pulley limiting and direction changing, the anchoring ends of the steel strands are tensioned downwards, and pre-pressing load is achieved. The steel strands are converted in the horizontal and vertical directions. The length of the steel strands is the stroke of the upper longitudinal beam assembly bent to the top wall of the bridge pier body through the lower counter-force beam assembly, is only related to the length of the upper longitudinal beam assembly, the distance between the upper longitudinal beam assembly and the lower counter-force beam assembly, the length of the lower counter-force beam assembly, the distance between the lower counter-force beam assembly and the top wall of the bridge pier body and the like, and is not related to the height of the bridge pier body, and the stress loss of the steel strand is effectively reduced.
本发明公开了一种自带预压组件的新型装配式0#块施工托架,属于桥梁技术领域。本发明在上纵梁组件下方设置下反力梁组件,并在下反力梁组件及索鞍组件上设置滑轮改变作用力方向;在预压荷载件张拉加载时,钢绞线张拉端受到沿顶壁向内张拉的张拉应力,张拉应力经滑轮限位及变向作用在上纵梁组件上,钢绞线锚固端向下张拉,实现预压荷载。钢绞线在水平向及竖向上变换,其长度为由上纵梁组件经下反力梁组件弯折至桥梁墩身顶壁的行程,只与上纵梁组件长度和其至下反力梁组件距离及下反力梁组件长度和其至桥梁墩身顶壁距离等相关,与桥梁墩身高度无关,有效降低钢绞线应力损失。
Novel fabricated 0# block construction bracket with pre-pressing assembly
The invention discloses a novel fabricated 0# block construction bracket with a pre-pressing assembly, and belongs to the technical field of bridges. A lower counter-force beam assembly is arranged below an upper longitudinal beam assembly, and the pulleys are arranged on a lower counter-force beam assembly and a cable saddle assembly to change the direction of acting force; when a pre-pressing load piece is tensioned and loaded, the tensioning ends of the steel strands bear tensioning stress which is tensioned inwards along the top wall, the tensioning stress acts on the upper longitudinal beam assembly through pulley limiting and direction changing, the anchoring ends of the steel strands are tensioned downwards, and pre-pressing load is achieved. The steel strands are converted in the horizontal and vertical directions. The length of the steel strands is the stroke of the upper longitudinal beam assembly bent to the top wall of the bridge pier body through the lower counter-force beam assembly, is only related to the length of the upper longitudinal beam assembly, the distance between the upper longitudinal beam assembly and the lower counter-force beam assembly, the length of the lower counter-force beam assembly, the distance between the lower counter-force beam assembly and the top wall of the bridge pier body and the like, and is not related to the height of the bridge pier body, and the stress loss of the steel strand is effectively reduced.
本发明公开了一种自带预压组件的新型装配式0#块施工托架,属于桥梁技术领域。本发明在上纵梁组件下方设置下反力梁组件,并在下反力梁组件及索鞍组件上设置滑轮改变作用力方向;在预压荷载件张拉加载时,钢绞线张拉端受到沿顶壁向内张拉的张拉应力,张拉应力经滑轮限位及变向作用在上纵梁组件上,钢绞线锚固端向下张拉,实现预压荷载。钢绞线在水平向及竖向上变换,其长度为由上纵梁组件经下反力梁组件弯折至桥梁墩身顶壁的行程,只与上纵梁组件长度和其至下反力梁组件距离及下反力梁组件长度和其至桥梁墩身顶壁距离等相关,与桥梁墩身高度无关,有效降低钢绞线应力损失。
Novel fabricated 0# block construction bracket with pre-pressing assembly
一种自带预压组件的新型装配式0#块施工托架
YU YUANZHI (author) / ZHENG ZHUAN (author) / HUANG XIANGJIAN (author) / YUAN DEREN (author) / XUE HONGYA (author) / ZENG LINGQUAN (author) / LIANG SHENG (author) / XIA DONG (author) / ZHOU HONGJIAN (author) / LAO ZENGHAO (author)
2021-08-10
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Pre-pressing construction method of assembly type 0 # block construction bracket
European Patent Office | 2021
|Fabricated bracket mounting structure for cable bent tower beam construction and pre-pressing method
European Patent Office | 2021
|BIM-based 0 # block fabricated bracket design and construction method thereof
European Patent Office | 2020
|Bracket reverse fulcrum pre-pressing construction method
European Patent Office | 2023
|High-altitude cable bent tower cross beam construction bracket pre-pressing assembly
European Patent Office | 2022
|