Temporary steel sheet pile ground anchor system and construction method
The invention discloses a temporary steel sheet pile ground anchor system which comprises a plurality of steel sheet piles, a cross beam, at least one clamping ring and at least one steel wire rope. The multiple steel sheet piles are arranged in parallel in the vertical direction, and one end of each steel sheet pile stretches underground. The center axis of the cross beam is perpendicular to the center axes of the multiple steel sheet piles, the cross beam is fixedly connected with the multiple steel sheet piles, the clamping rings are fixed to at least one steel sheet pile, one end of the steel wire rope is fixedly connected with the clamping rings, and the other end of the steel wire rope is connected with a linear winch. Rapid installation of a ground anchor is achieved. Meanwhile, the dismounting is a reverse process and is very simple. The steel sheet piles, the cross beams, the rigging and the like of the ground anchor can be recycled for multiple times, and cost is low.
本发明公开了一种临时钢板桩地锚系统,包括多个钢板桩、横梁、至少一个卡环和至少一条钢丝绳,多个所述钢板桩沿竖直方向平行设置并且一端伸入到地下,所述横梁的中心轴线垂直多个所述钢板桩的中心轴线且与多个所述钢板桩固定连接,其中至少一个所述钢板桩均固定有所述卡环,所述钢丝绳的一端固定连接所述卡环,所述钢丝绳的另一端连接线性绞车,本发明实现了地锚的快速安装,同时拆除是反过程,非常简单;地锚的钢板桩、横梁和索具等,可回收多次使用,成本低。
Temporary steel sheet pile ground anchor system and construction method
The invention discloses a temporary steel sheet pile ground anchor system which comprises a plurality of steel sheet piles, a cross beam, at least one clamping ring and at least one steel wire rope. The multiple steel sheet piles are arranged in parallel in the vertical direction, and one end of each steel sheet pile stretches underground. The center axis of the cross beam is perpendicular to the center axes of the multiple steel sheet piles, the cross beam is fixedly connected with the multiple steel sheet piles, the clamping rings are fixed to at least one steel sheet pile, one end of the steel wire rope is fixedly connected with the clamping rings, and the other end of the steel wire rope is connected with a linear winch. Rapid installation of a ground anchor is achieved. Meanwhile, the dismounting is a reverse process and is very simple. The steel sheet piles, the cross beams, the rigging and the like of the ground anchor can be recycled for multiple times, and cost is low.
本发明公开了一种临时钢板桩地锚系统,包括多个钢板桩、横梁、至少一个卡环和至少一条钢丝绳,多个所述钢板桩沿竖直方向平行设置并且一端伸入到地下,所述横梁的中心轴线垂直多个所述钢板桩的中心轴线且与多个所述钢板桩固定连接,其中至少一个所述钢板桩均固定有所述卡环,所述钢丝绳的一端固定连接所述卡环,所述钢丝绳的另一端连接线性绞车,本发明实现了地锚的快速安装,同时拆除是反过程,非常简单;地锚的钢板桩、横梁和索具等,可回收多次使用,成本低。
Temporary steel sheet pile ground anchor system and construction method
一种临时钢板桩地锚系统和施工方法
LI HUAILIANG (author) / YU WENTAI (author) / LI JIANNAN (author) / WEI ZUOSHUI (author) / WU SHIPENG (author) / GAN HUILIANG (author) / CHAI XINCHEN (author) / LI BIN (author) / ZHOU NAN (author) / WANG LIANG (author)
2021-08-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONSTRUCTION METHOD OF SHEATHING TEMPORARY FACILITY USING STEEL SHEET PILE
European Patent Office | 2020
|Anchor cable construction method in steel sheet pile slope protection area