A platform for research: civil engineering, architecture and urbanism
Rock mountain excavation construction method for slope treatment
The invention discloses a rock mountain excavation construction method for slope treatment. The rock mountain excavation construction method comprises the following steps of: before construction, actually measuring an earth-rock excavation section, and paying off before earth-rock excavation; removing and transporting out trees, shrubs, garbage, organic matter residues in a construction range and turf, tree roots, root systems of crops and surface soil within at least 300 mm below the original ground, manually removing dangerous rocks and turquoise on a slope surface, making a slope to be smooth as much as possible, and removing cracked dangerous rock masses one by one through an air pick; and before earth-rock excavation, constructing a catchwater and a drainage ditch. According to the method, a slope of a rock mountain can be treated, the situation that construction cannot be conducted due to environmental factors or geographical factors is avoided, the influence on a surrounding environment of excavation is small in the construction process, large-area soil and stone splashing is avoided in the excavation process, the influence on the surrounding environment is reduced, and the problems that blasting construction cannot be carried out due to environmental factors or geographical factors, and the construction efficiency is affected are solved.
本发明公开了一种用于边坡治理的石方山体开挖施工方法,施工前对土石方开挖断面进行实际测量,并在土石方开挖前进行放线;对施工范围的树木、灌木、垃圾、有机物残渣及原地面以下至少300mm内的草皮、树根、农作物的根系和表土清除并外运,并人工清除坡面危岩及松石,并使坡面尽量平整,对已开裂危岩体采用风镐逐块清除;在进行土石方开挖前先进行截水沟、排水沟修筑。本发明可对石方山体的边坡进行治理,而且不会因为环境因素或地理因素造成无法施工,且施工过程中对开挖的周围环境影响小,而且在挖掘过程中,不会造成大面积的土石飞溅,降低了对周围环境的影响,从而解决了因为环境因素或地理因素,无法进行爆破施工,影响施工效率的问题。
Rock mountain excavation construction method for slope treatment
The invention discloses a rock mountain excavation construction method for slope treatment. The rock mountain excavation construction method comprises the following steps of: before construction, actually measuring an earth-rock excavation section, and paying off before earth-rock excavation; removing and transporting out trees, shrubs, garbage, organic matter residues in a construction range and turf, tree roots, root systems of crops and surface soil within at least 300 mm below the original ground, manually removing dangerous rocks and turquoise on a slope surface, making a slope to be smooth as much as possible, and removing cracked dangerous rock masses one by one through an air pick; and before earth-rock excavation, constructing a catchwater and a drainage ditch. According to the method, a slope of a rock mountain can be treated, the situation that construction cannot be conducted due to environmental factors or geographical factors is avoided, the influence on a surrounding environment of excavation is small in the construction process, large-area soil and stone splashing is avoided in the excavation process, the influence on the surrounding environment is reduced, and the problems that blasting construction cannot be carried out due to environmental factors or geographical factors, and the construction efficiency is affected are solved.
本发明公开了一种用于边坡治理的石方山体开挖施工方法,施工前对土石方开挖断面进行实际测量,并在土石方开挖前进行放线;对施工范围的树木、灌木、垃圾、有机物残渣及原地面以下至少300mm内的草皮、树根、农作物的根系和表土清除并外运,并人工清除坡面危岩及松石,并使坡面尽量平整,对已开裂危岩体采用风镐逐块清除;在进行土石方开挖前先进行截水沟、排水沟修筑。本发明可对石方山体的边坡进行治理,而且不会因为环境因素或地理因素造成无法施工,且施工过程中对开挖的周围环境影响小,而且在挖掘过程中,不会造成大面积的土石飞溅,降低了对周围环境的影响,从而解决了因为环境因素或地理因素,无法进行爆破施工,影响施工效率的问题。
Rock mountain excavation construction method for slope treatment
一种用于边坡治理的石方山体开挖施工方法
WANG YAJUN (author) / ZHANG ZHIHUI (author) / ZHAO YUNLING (author) / LI JUANJUAN (author)
2021-08-10
Patent
Electronic Resource
Chinese
Mountain treatment slope drainage excavation equipment and excavation method
European Patent Office | 2023
|High slope mountain rock forward stabilization treatment method
European Patent Office | 2023
|European Patent Office | 2020
|Slope excavation supporting structure and construction method
European Patent Office | 2021
|