A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of water conservancy projects, and discloses a drainage groove for the water conservancy project. The drainage groove comprises a first drainage groove, an elastic interceptor is arranged on the inner side of the first drainage groove, a first water outlet hole is formed in the surface of the elastic interceptor, a baffle is arranged in the first drainage groove, a second water outlet hole is formed in the surface of the baffle, a fixed disc is arranged in the middle of the baffle, balls are movably connected into the fixed disc, a movable disc is movably connected to the outer sides of the balls, and partition pieces are arranged on the inner side of the movable disc. By arranging the elastic interceptor, the baffle, the partition pieces and the like, the advantage of being easy to clean is achieved; meanwhile, when water flow in the drainage groove is too small, the elastic interceptor is blocked, the baffle moves towards the end of the elastic interceptor and cleans the elastic interceptor; and when a rectangular opening is blocked, the height of a floating ball is decreased, the baffle moves reversely and drives a wedge-shaped rod to move synchronously, the wedge-shaped rod and the buckle plate are matched in a wedge-shaped mode to drive the cover plate to incline along the movable rod end, and the aim of easy cleaning is achieved.
本发明属于水利工程技术领域,且公开了一种水利工程用排水沟槽,包括第一排水槽,所述第一排水槽的内侧设有弹性拦截器,所述弹性拦截器的表面开设有第一出水孔,所述第一排水槽内部设有挡板,所述挡板的表面开设有第二出水孔,所述挡板的中部设有固定盘,所述固定盘的内部活动连接有滚珠,所述滚珠的外侧活动连接有活动盘,所述活动盘的内侧设有分割片。本发明通过设置有弹性拦截器、挡板和分割片等以实现易清理的优点,同时当排水沟槽内水流过小弹性拦截器堵塞时,挡板朝弹性拦截器端移动并对其进行清理,当矩形口堵塞时,浮球高度下降,挡板反向移动并带动楔形杆同步移动,楔形杆与扣板楔形配合带动盖板沿活动杆端发生倾斜,达到易清理目的。
The invention belongs to the technical field of water conservancy projects, and discloses a drainage groove for the water conservancy project. The drainage groove comprises a first drainage groove, an elastic interceptor is arranged on the inner side of the first drainage groove, a first water outlet hole is formed in the surface of the elastic interceptor, a baffle is arranged in the first drainage groove, a second water outlet hole is formed in the surface of the baffle, a fixed disc is arranged in the middle of the baffle, balls are movably connected into the fixed disc, a movable disc is movably connected to the outer sides of the balls, and partition pieces are arranged on the inner side of the movable disc. By arranging the elastic interceptor, the baffle, the partition pieces and the like, the advantage of being easy to clean is achieved; meanwhile, when water flow in the drainage groove is too small, the elastic interceptor is blocked, the baffle moves towards the end of the elastic interceptor and cleans the elastic interceptor; and when a rectangular opening is blocked, the height of a floating ball is decreased, the baffle moves reversely and drives a wedge-shaped rod to move synchronously, the wedge-shaped rod and the buckle plate are matched in a wedge-shaped mode to drive the cover plate to incline along the movable rod end, and the aim of easy cleaning is achieved.
本发明属于水利工程技术领域,且公开了一种水利工程用排水沟槽,包括第一排水槽,所述第一排水槽的内侧设有弹性拦截器,所述弹性拦截器的表面开设有第一出水孔,所述第一排水槽内部设有挡板,所述挡板的表面开设有第二出水孔,所述挡板的中部设有固定盘,所述固定盘的内部活动连接有滚珠,所述滚珠的外侧活动连接有活动盘,所述活动盘的内侧设有分割片。本发明通过设置有弹性拦截器、挡板和分割片等以实现易清理的优点,同时当排水沟槽内水流过小弹性拦截器堵塞时,挡板朝弹性拦截器端移动并对其进行清理,当矩形口堵塞时,浮球高度下降,挡板反向移动并带动楔形杆同步移动,楔形杆与扣板楔形配合带动盖板沿活动杆端发生倾斜,达到易清理目的。
Drainage groove for water conservancy project
一种水利工程用排水沟槽
RAN BAOJIE (author)
2021-08-10
Patent
Electronic Resource
Chinese
Water conservancy pipeline for water conservancy project drainage
European Patent Office | 2023
|Water conservancy pipeline for water conservancy project drainage
European Patent Office | 2024
|Water conservancy drainage device based on water conservancy project
European Patent Office | 2024
|