A platform for research: civil engineering, architecture and urbanism
The invention relates to a bonding steel reinforcement construction method for a beam column of constructional engineering. The bonding steel reinforcement construction method for the beam column of constructional engineering adopts the following constructional engineering beam column bonding steel reinforcement construction device which comprises a base, walking wheels, a lifting mechanism, a [-shaped plate, a reciprocating mechanism and a dust shoveling mechanism. The walking wheels are arranged on the inner sides of the corners of the lower end face of the base correspondingly, the lifting mechanism is arranged in the middle of the upper end face of the base, the [-shaped plate is arranged at the upper end of the lifting mechanism, and the reciprocating mechanism and the dust shoveling mechanism are sequentially arranged on the upper end face of the [-shaped plate from right to left. According to the bonding steel reinforcement construction method, the problems that in the prior art, in the process that a person stands on a ladder type object to manually clear the surface of a beam column, the automation degree of manual clearing is low, therefore the clearing efficiency of the surface of the beam column is reduced, the angle between a shovel tool and the beam column cannot be accurately controlled manually, and consequently, the clearing effect on the surface of the beam column is reduced can be solved.
本发明涉及一种建筑工程梁柱粘钢加固施工方法,该建筑工程梁柱粘钢加固施工方法采用如下建筑工程梁柱粘钢加固施工装置,该建筑工程梁柱粘钢加固施工装置包括底座、行走轮、升降机构、匚形板、往复机构和铲灰机构,底座下端面拐角内侧均设置有行走轮,底座上端面中部设置有升降机构,升降机构上端设置有匚形板,匚形板上端面从右往左依次设置有往复机构和铲灰机构;本发明能够解决现有技术在采用人为站在梯子类物品上手动对梁柱表面进行清理的过程中存在的:手动清理的自动化程度较低,从而降低了对梁柱表面进行清理的效率;人为无法精准控制铲类工具与梁柱之间的角度,从而降低了对梁柱表面进行清理的效果等问题。
The invention relates to a bonding steel reinforcement construction method for a beam column of constructional engineering. The bonding steel reinforcement construction method for the beam column of constructional engineering adopts the following constructional engineering beam column bonding steel reinforcement construction device which comprises a base, walking wheels, a lifting mechanism, a [-shaped plate, a reciprocating mechanism and a dust shoveling mechanism. The walking wheels are arranged on the inner sides of the corners of the lower end face of the base correspondingly, the lifting mechanism is arranged in the middle of the upper end face of the base, the [-shaped plate is arranged at the upper end of the lifting mechanism, and the reciprocating mechanism and the dust shoveling mechanism are sequentially arranged on the upper end face of the [-shaped plate from right to left. According to the bonding steel reinforcement construction method, the problems that in the prior art, in the process that a person stands on a ladder type object to manually clear the surface of a beam column, the automation degree of manual clearing is low, therefore the clearing efficiency of the surface of the beam column is reduced, the angle between a shovel tool and the beam column cannot be accurately controlled manually, and consequently, the clearing effect on the surface of the beam column is reduced can be solved.
本发明涉及一种建筑工程梁柱粘钢加固施工方法,该建筑工程梁柱粘钢加固施工方法采用如下建筑工程梁柱粘钢加固施工装置,该建筑工程梁柱粘钢加固施工装置包括底座、行走轮、升降机构、匚形板、往复机构和铲灰机构,底座下端面拐角内侧均设置有行走轮,底座上端面中部设置有升降机构,升降机构上端设置有匚形板,匚形板上端面从右往左依次设置有往复机构和铲灰机构;本发明能够解决现有技术在采用人为站在梯子类物品上手动对梁柱表面进行清理的过程中存在的:手动清理的自动化程度较低,从而降低了对梁柱表面进行清理的效率;人为无法精准控制铲类工具与梁柱之间的角度,从而降低了对梁柱表面进行清理的效果等问题。
Bonding steel reinforcement construction method for beam column of constructional engineering
一种建筑工程梁柱粘钢加固施工方法
LI MEIHUA (author)
2021-08-17
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2021
|European Patent Office | 2023
|Constructional column construction method and constructional column mold
European Patent Office | 2021
|Steel reinforcement cage positioning device for constructional engineering construction
European Patent Office | 2021
|