Offshore wind plant steel pipe pile foundation batch floating transportation system and working method thereof
The invention discloses an offshore wind plant steel pipe pile foundation batch floating transportation system and a working method thereof, and belongs to the technical field of offshore wind power construction transportation. The system comprises an air bag device, a steel pipe pile fixing device, an inflation device, a floating transportation dragging cable, an inflation pipe and a carrier. The multiple steel pipe piles are fixed to the steel pipe pile fixing devices, and each steel pipe pile is filled with the corresponding air bag device. The two ends of the floating transportation dragging cable are connected with the steel pipe pile fixing device and the carrier correspondingly. One end of the inflation tube is connected with the inflation device, and the other end of the inflation tube is connected with each air bag device. The system is reasonable in design and simple in construction, does not depend on special ship machine equipment and tools, reduces the transportation difficulty and cost, and has a good application prospect.
本发明公开的一种海上风电场钢管桩基础批量浮运系统及其工作方法,属于海上风电施工运输技术领域。包括气囊装置、钢管桩固定装置、充气装置、浮运拖动缆绳、充气管和载具;若干钢管桩固定在钢管桩固定装置上,气囊装置填充在每根钢管桩内;浮运拖动缆绳的两端分别与钢管桩固定装置和载具连接;充气管的一端与充气装置连接,另一端分别与每个气囊装置连接。本发明系统设计合理、构建简单,不依赖特殊的船机设备和工装,降低了运输的难度和成本,具有良好的应用前景。
Offshore wind plant steel pipe pile foundation batch floating transportation system and working method thereof
The invention discloses an offshore wind plant steel pipe pile foundation batch floating transportation system and a working method thereof, and belongs to the technical field of offshore wind power construction transportation. The system comprises an air bag device, a steel pipe pile fixing device, an inflation device, a floating transportation dragging cable, an inflation pipe and a carrier. The multiple steel pipe piles are fixed to the steel pipe pile fixing devices, and each steel pipe pile is filled with the corresponding air bag device. The two ends of the floating transportation dragging cable are connected with the steel pipe pile fixing device and the carrier correspondingly. One end of the inflation tube is connected with the inflation device, and the other end of the inflation tube is connected with each air bag device. The system is reasonable in design and simple in construction, does not depend on special ship machine equipment and tools, reduces the transportation difficulty and cost, and has a good application prospect.
本发明公开的一种海上风电场钢管桩基础批量浮运系统及其工作方法,属于海上风电施工运输技术领域。包括气囊装置、钢管桩固定装置、充气装置、浮运拖动缆绳、充气管和载具;若干钢管桩固定在钢管桩固定装置上,气囊装置填充在每根钢管桩内;浮运拖动缆绳的两端分别与钢管桩固定装置和载具连接;充气管的一端与充气装置连接,另一端分别与每个气囊装置连接。本发明系统设计合理、构建简单,不依赖特殊的船机设备和工装,降低了运输的难度和成本,具有良好的应用前景。
Offshore wind plant steel pipe pile foundation batch floating transportation system and working method thereof
一种海上风电场钢管桩基础批量浮运系统及其工作方法
ZENG CHONGJI (author) / LIU XIN (author) / BAI ZHUANGZHI (author) / ZHENG HAI (author) / YAN SHU (author) / LIN JIANPING (author) / LIU HENG (author)
2021-08-20
Patent
Electronic Resource
Chinese
Offshore wind plant steel pipe pile floating transportation device
European Patent Office | 2015
|Offshore pile splicing anti-corrosion process of offshore wind power foundation steel pipe pile
European Patent Office | 2020
|Offshore steel pipe pile transportation device and transportation method
European Patent Office | 2023
|Offshore wind plant fan single pile foundation and construction method thereof
European Patent Office | 2016
|Offshore wind plant pile foundation settlement monitoring system and method
European Patent Office | 2024
|