A platform for research: civil engineering, architecture and urbanism
Basement exterior wall post-cast strip prefabricated slab blocking part and blocking construction method
The invention relates to the field of post-cast strip blocking parts, in particular to a basement exterior wall post-cast strip prefabricated slab blocking part and a blocking construction method. The basement exterior wall post-cast strip prefabricated slab blocking part comprises a prefabricated slab body and structural steel bars arranged in the prefabricated slab body. A plurality of protrusions are arranged on the surface of one side of the prefabricated slab body; the multiple protrusions are divided into two groups which are close to the two horizontal ends of the prefabricated slab body respectively; and the protrusions are used for being clamped in clamping grooves formed in an exterior wall body. The basement outer wall post-cast strip prefabricated slab blocking construction method includes the steps of post-cast strip cleaning, clamping groove forming, sequential stacking of the basement exterior wall post-cast strip prefabricated slab blocking parts from bottom to top and blocking of a post-cast strip, slope-shaped connecting part manufacturing, waterproof layer arranging and the like. According to the basement exterior wall post-cast strip prefabricated slab blocking part and the blocking construction method, relative positions of the prefabricated slab blocking part and the exterior wall body are effectively locked, so that connection between the prefabricated slab blocking part and the exterior wall body is more stable and tighter, and the blocking effect of the prefabricated slab blocking part on the post-cast strip is improved.
本申请涉及后浇带封挡件的领域,尤其是涉及一种地下室外墙后浇带预制板封挡件及封挡施工方法。地下室外墙后浇带预制板封挡件,包括预制板体以及设置于预制板体内的结构钢筋;所述预制板体的一侧表面上设有多个凸起,多个所述凸起分成两组,分别临近预制板体的两个水平端,所述凸起用于卡接在外墙墙体设置的卡槽中。地下室外墙后浇带预制板封挡施工方法,包括后浇带清理、卡槽开设、地下室外墙后浇带预制板封挡件由下而上依次叠放并封挡后浇带、制作坡形连接部以及设置防水层等步骤。本申请有效地锁定了预制板封挡件和外墙墙体的相对位置,使预制板封挡件和外墙墙体的连接更加稳固和紧密,从而提高了预制板封挡件对后浇带的封堵效果。
Basement exterior wall post-cast strip prefabricated slab blocking part and blocking construction method
The invention relates to the field of post-cast strip blocking parts, in particular to a basement exterior wall post-cast strip prefabricated slab blocking part and a blocking construction method. The basement exterior wall post-cast strip prefabricated slab blocking part comprises a prefabricated slab body and structural steel bars arranged in the prefabricated slab body. A plurality of protrusions are arranged on the surface of one side of the prefabricated slab body; the multiple protrusions are divided into two groups which are close to the two horizontal ends of the prefabricated slab body respectively; and the protrusions are used for being clamped in clamping grooves formed in an exterior wall body. The basement outer wall post-cast strip prefabricated slab blocking construction method includes the steps of post-cast strip cleaning, clamping groove forming, sequential stacking of the basement exterior wall post-cast strip prefabricated slab blocking parts from bottom to top and blocking of a post-cast strip, slope-shaped connecting part manufacturing, waterproof layer arranging and the like. According to the basement exterior wall post-cast strip prefabricated slab blocking part and the blocking construction method, relative positions of the prefabricated slab blocking part and the exterior wall body are effectively locked, so that connection between the prefabricated slab blocking part and the exterior wall body is more stable and tighter, and the blocking effect of the prefabricated slab blocking part on the post-cast strip is improved.
本申请涉及后浇带封挡件的领域,尤其是涉及一种地下室外墙后浇带预制板封挡件及封挡施工方法。地下室外墙后浇带预制板封挡件,包括预制板体以及设置于预制板体内的结构钢筋;所述预制板体的一侧表面上设有多个凸起,多个所述凸起分成两组,分别临近预制板体的两个水平端,所述凸起用于卡接在外墙墙体设置的卡槽中。地下室外墙后浇带预制板封挡施工方法,包括后浇带清理、卡槽开设、地下室外墙后浇带预制板封挡件由下而上依次叠放并封挡后浇带、制作坡形连接部以及设置防水层等步骤。本申请有效地锁定了预制板封挡件和外墙墙体的相对位置,使预制板封挡件和外墙墙体的连接更加稳固和紧密,从而提高了预制板封挡件对后浇带的封堵效果。
Basement exterior wall post-cast strip prefabricated slab blocking part and blocking construction method
地下室外墙后浇带预制板封挡件及封挡施工方法
YE QING (author) / QIAN ZHENG (author) / GU CHUNQUAN (author) / YANG ZHENYI (author) / YAN CHAOYAN (author) / SONG CHUNXIAN (author) / GONG MINHUA (author) / ZHU ZHONGHUA (author) / ZUO ZHONGHUA (author) / NI GANG (author)
2021-08-24
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement exterior wall post-cast strip U-shaped concrete prefabricated slab blocking method
European Patent Office | 2022
|European Patent Office | 2024
|European Patent Office | 2020
|Pre-blocking construction device for post-cast strip of basement retaining wall
European Patent Office | 2023
|Construction method for closing basement exterior wall post-cast strip
European Patent Office | 2015
|