A platform for research: civil engineering, architecture and urbanism
Steel-structured concrete-free foundation structure in full bolt connection
The invention discloses a steel-structured concrete-free foundation structure in full bolt connection. The steel-structured concrete-free foundation structure comprises a base used for supporting a house load, a bearing seat and a connecting component, wherein the base is installed on a foundation through ground nails, and the bearing seat is installed on the base through a plurality of supporting pieces and is provided with a height-adjustable containing space used for containing filler; and the connecting component is installed on the bearing base and used for being connected with a column body and a beam body of a house. Through structural improvement, the base is matched with the ground nails to support the bearing seat, the connecting component is installed with the column body and the beam body, concrete does not need to be poured inside for full-bolt connection, the construction period is shortened, and the structure is stable.
本发明公开了一种全螺栓联接的钢结构免混凝土基础结构,其包括用于支撑房屋载荷的基座、承重座及连接构件,所述基座通过地钉安装在地基上,所述承重座通过多个支撑件安装在基座上并具有一高度可调用于放置填充物的容置空间;所述连接构件安装在承重座上并用于与房屋的柱体及梁体相连接安装;本发明通过改进结构,通过基座配合地钉支撑承重座,利用连接构件分别与柱体、梁体相安装,全螺栓联接无需在内部浇灌混凝土,缩短了施工周期且结构稳固。
Steel-structured concrete-free foundation structure in full bolt connection
The invention discloses a steel-structured concrete-free foundation structure in full bolt connection. The steel-structured concrete-free foundation structure comprises a base used for supporting a house load, a bearing seat and a connecting component, wherein the base is installed on a foundation through ground nails, and the bearing seat is installed on the base through a plurality of supporting pieces and is provided with a height-adjustable containing space used for containing filler; and the connecting component is installed on the bearing base and used for being connected with a column body and a beam body of a house. Through structural improvement, the base is matched with the ground nails to support the bearing seat, the connecting component is installed with the column body and the beam body, concrete does not need to be poured inside for full-bolt connection, the construction period is shortened, and the structure is stable.
本发明公开了一种全螺栓联接的钢结构免混凝土基础结构,其包括用于支撑房屋载荷的基座、承重座及连接构件,所述基座通过地钉安装在地基上,所述承重座通过多个支撑件安装在基座上并具有一高度可调用于放置填充物的容置空间;所述连接构件安装在承重座上并用于与房屋的柱体及梁体相连接安装;本发明通过改进结构,通过基座配合地钉支撑承重座,利用连接构件分别与柱体、梁体相安装,全螺栓联接无需在内部浇灌混凝土,缩短了施工周期且结构稳固。
Steel-structured concrete-free foundation structure in full bolt connection
一种全螺栓联接的钢结构免混凝土基础结构
HE YONGKANG (author) / LIU ZHIWEN (author)
2021-08-27
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel-structured wall body structure in full bolt connection
European Patent Office | 2021
|Modularized steel structure full bolt connection semi-rigid joint
European Patent Office | 2024
|Steel frame structure system adopting full bolt side plate connection
European Patent Office | 2022
|