A platform for research: civil engineering, architecture and urbanism
Integrated construction method for fabricated building outer wall
The invention discloses an integrated construction method for a fabricated building outer wall. The integrated construction method comprises the following steps: step 1, a single-layer standard layer main body structure is decomposed; step 2, an outer wall decoration engineering construction process is decomposed; step 3, the position relation between an external climbing scaffold and a main body in the construction period of the single-layer standard layer main body structure is analyzed, and the division of external wall decoration working floors is planned; step 4, a construction plan is made according to the relation between the main body structure and the outer wall process and time; and step 5, the frame body structure of the external climbing scaffold is used for protecting finished products of the finished floors, and pollution is prevented. The construction time of the main body structure is utilized, the outer wall decoration work is reasonably added, and the purpose of greatly shortening the construction period is achieved; and the external climbing scaffold is fully utilized to carry out external wall decoration construction on different floors.
本发明公开了一种装配式建筑外墙一体化施工方法,包括以下步骤:步骤1、分解单层标准层主体结构施工工序;步骤2、分解外墙装饰工程施工工序;步骤3、分析主体结构单层标准层施工期间外爬架与主体的位置关系,规划外墙装饰装修工作楼层划分;步骤4、根据主体结构及外墙工序与时间的关系,制定施工计划;步骤5、利用爬升式外脚手架的架体构造,做已完工楼层的成品保护,防止污染。本发明利用了主体结构的施工时间,将外墙装饰装修工作合理穿插进去,达到大幅度节约施工工期的目的;并充分利用爬升式外脚手架分楼层进行外墙装饰装修施工。
Integrated construction method for fabricated building outer wall
The invention discloses an integrated construction method for a fabricated building outer wall. The integrated construction method comprises the following steps: step 1, a single-layer standard layer main body structure is decomposed; step 2, an outer wall decoration engineering construction process is decomposed; step 3, the position relation between an external climbing scaffold and a main body in the construction period of the single-layer standard layer main body structure is analyzed, and the division of external wall decoration working floors is planned; step 4, a construction plan is made according to the relation between the main body structure and the outer wall process and time; and step 5, the frame body structure of the external climbing scaffold is used for protecting finished products of the finished floors, and pollution is prevented. The construction time of the main body structure is utilized, the outer wall decoration work is reasonably added, and the purpose of greatly shortening the construction period is achieved; and the external climbing scaffold is fully utilized to carry out external wall decoration construction on different floors.
本发明公开了一种装配式建筑外墙一体化施工方法,包括以下步骤:步骤1、分解单层标准层主体结构施工工序;步骤2、分解外墙装饰工程施工工序;步骤3、分析主体结构单层标准层施工期间外爬架与主体的位置关系,规划外墙装饰装修工作楼层划分;步骤4、根据主体结构及外墙工序与时间的关系,制定施工计划;步骤5、利用爬升式外脚手架的架体构造,做已完工楼层的成品保护,防止污染。本发明利用了主体结构的施工时间,将外墙装饰装修工作合理穿插进去,达到大幅度节约施工工期的目的;并充分利用爬升式外脚手架分楼层进行外墙装饰装修施工。
Integrated construction method for fabricated building outer wall
一种装配式建筑外墙一体化施工方法
JIA XUEJUN (author) / SU XIANXIN (author) / LIU KEJU (author) / GU XIAO (author) / FAN XIAOJIANG (author)
2021-08-31
Patent
Electronic Resource
Chinese
Fabricated building outer wall structure construction method
European Patent Office | 2024
|Fabricated ALC plate building outer wall and integrated construction method thereof
European Patent Office | 2024
|Fabricated building outer wall energy-saving construction method
European Patent Office | 2024
|Fabricated building outer wall and construction method thereof
European Patent Office | 2024
|Fabricated building outer wall and construction method thereof
European Patent Office | 2023
|