Prestressed tubular pile construction process
The invention discloses a prestressed tubular pile construction process. The prestressed tubular pile construction process comprises the following steps that a surveying and setting-out system is mounted on a tubular pile machine; a coordinate system is measured and established through known points; the tubular pile machine is leveled; the pile position of the tubular pile machine is checked; coordinates of the tubular pile needing to be constructed are input; the machine is moved to the position corresponding to the coordinates of the tubular pile according to instructions; and tubular pile construction is started. According to the prestressed tubular pile construction process, the surveying and setting-out system is mounted on the tubular pile machine, the coordinate system is measured and established through the known points, the pile position of the tubular pile machine is checked after the tubular pile machine is leveled, the coordinates of the tubular pile needing to be constructed are input, then the machine is moved to the position corresponding to the coordinates of the tubular pile according to the instructions, and therefore tubular pile construction is started. The prestressed tubular pile construction process is simple, operation is convenient, the accuracy of the pile position can be guaranteed, and control over the progress and quality of a project is facilitated.
本发明公开了一种预应力管桩施工工艺,包括:在管桩机安装测量放线系统;通过已知点测量并建立坐标系;调平管桩机;校核管桩机桩位;输入需要施工的管桩坐标;按照指示移机到与管桩坐标对应的位置;开始管桩施工。本发明的预应力管桩施工工艺通过在管桩机上安装测量放线系统,并通过已知点测量并建立坐标系,调平管桩机后校核管桩机桩位,输入需要施工的管桩坐标后按照指示移机到与管桩坐标对应的位置,从而开始管桩施工,该施工工艺简单,操作方便,能够保证桩位的准确性,有利于项目的进度和质量的控制。
Prestressed tubular pile construction process
The invention discloses a prestressed tubular pile construction process. The prestressed tubular pile construction process comprises the following steps that a surveying and setting-out system is mounted on a tubular pile machine; a coordinate system is measured and established through known points; the tubular pile machine is leveled; the pile position of the tubular pile machine is checked; coordinates of the tubular pile needing to be constructed are input; the machine is moved to the position corresponding to the coordinates of the tubular pile according to instructions; and tubular pile construction is started. According to the prestressed tubular pile construction process, the surveying and setting-out system is mounted on the tubular pile machine, the coordinate system is measured and established through the known points, the pile position of the tubular pile machine is checked after the tubular pile machine is leveled, the coordinates of the tubular pile needing to be constructed are input, then the machine is moved to the position corresponding to the coordinates of the tubular pile according to the instructions, and therefore tubular pile construction is started. The prestressed tubular pile construction process is simple, operation is convenient, the accuracy of the pile position can be guaranteed, and control over the progress and quality of a project is facilitated.
本发明公开了一种预应力管桩施工工艺,包括:在管桩机安装测量放线系统;通过已知点测量并建立坐标系;调平管桩机;校核管桩机桩位;输入需要施工的管桩坐标;按照指示移机到与管桩坐标对应的位置;开始管桩施工。本发明的预应力管桩施工工艺通过在管桩机上安装测量放线系统,并通过已知点测量并建立坐标系,调平管桩机后校核管桩机桩位,输入需要施工的管桩坐标后按照指示移机到与管桩坐标对应的位置,从而开始管桩施工,该施工工艺简单,操作方便,能够保证桩位的准确性,有利于项目的进度和质量的控制。
Prestressed tubular pile construction process
一种预应力管桩施工工艺
HUANG PEI (author) / NING JIANPENG (author) / XIE JINHUI (author) / BI YONGHONG (author) / TANG LEILEI (author) / XU CHAO (author) / XIONG ZIYAN (author) / ZHUANG XINGWU (author) / BAI YANGKUI (author) / ZHANG YINGYU (author)
2021-09-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Tubular pile structure for improving strength of prestressed concrete tubular pile
European Patent Office | 2024
|Tubular pile structure for improving strength of prestressed concrete tubular pile
European Patent Office | 2023
|