A platform for research: civil engineering, architecture and urbanism
Steel beam structure capable of being rapidly and accurately hoisted and construction method thereof
The invention discloses a steel beam structure capable of being rapidly and accurately hoisted and a construction method thereof. The steel beam structure comprises a steel beam body and two support mechanisms, wherein the two support mechanisms are oppositely arranged, both ends of the steel beam body are fixed to the tops of the two support mechanisms correspondingly, a plurality of first limiting pieces and a plurality of second limiting pieces are respectively arranged on the both ends of the steel beam body, the plurality of first limiting pieces are distributed in the longitudinal direction of the steel beam body at intervals, the plurality of second limiting pieces are distributed in the longitudinal direction of the steel beam body at intervals, the first limiting pieces are arranged between every two adjacent second limiting pieces, a plurality of third limiting pieces are arranged on the tops of the support mechanisms in the longitudinal direction, and the first limiting pieces and/or the second limiting pieces are located between every two adjacent third limiting pieces. When the steel beam structure is hoisted, rapid and accurate positioning can be achieved, and the hoisting efficiency is improved.
本发明公开了一种快速精准吊装的钢梁结构及其施工方法,钢梁结构包括钢梁本体、两个相对设置的支撑机构,所述钢梁本体的两端分别固定于两个所述支撑机构的顶部,所述钢梁本体的两端均分别设有多个第一限位件、多组第二限位件,多个所述第一限位件在所述钢梁本体的纵向方向上间隔分布,多组所述第二限位件在所述钢梁本体的纵向方向上间隔分布,所述第一限位件设置于相邻的两组所述第二限位件之间,所述支撑机构的顶部在纵向方向上设有多个第三限位件,所述第一限位件和/或所述第二限位件位于相邻的两个所述第三限位件之间。本发明的钢梁结构在吊装时可实现快速精准定位,提供吊装效率。
Steel beam structure capable of being rapidly and accurately hoisted and construction method thereof
The invention discloses a steel beam structure capable of being rapidly and accurately hoisted and a construction method thereof. The steel beam structure comprises a steel beam body and two support mechanisms, wherein the two support mechanisms are oppositely arranged, both ends of the steel beam body are fixed to the tops of the two support mechanisms correspondingly, a plurality of first limiting pieces and a plurality of second limiting pieces are respectively arranged on the both ends of the steel beam body, the plurality of first limiting pieces are distributed in the longitudinal direction of the steel beam body at intervals, the plurality of second limiting pieces are distributed in the longitudinal direction of the steel beam body at intervals, the first limiting pieces are arranged between every two adjacent second limiting pieces, a plurality of third limiting pieces are arranged on the tops of the support mechanisms in the longitudinal direction, and the first limiting pieces and/or the second limiting pieces are located between every two adjacent third limiting pieces. When the steel beam structure is hoisted, rapid and accurate positioning can be achieved, and the hoisting efficiency is improved.
本发明公开了一种快速精准吊装的钢梁结构及其施工方法,钢梁结构包括钢梁本体、两个相对设置的支撑机构,所述钢梁本体的两端分别固定于两个所述支撑机构的顶部,所述钢梁本体的两端均分别设有多个第一限位件、多组第二限位件,多个所述第一限位件在所述钢梁本体的纵向方向上间隔分布,多组所述第二限位件在所述钢梁本体的纵向方向上间隔分布,所述第一限位件设置于相邻的两组所述第二限位件之间,所述支撑机构的顶部在纵向方向上设有多个第三限位件,所述第一限位件和/或所述第二限位件位于相邻的两个所述第三限位件之间。本发明的钢梁结构在吊装时可实现快速精准定位,提供吊装效率。
Steel beam structure capable of being rapidly and accurately hoisted and construction method thereof
一种快速精准吊装的钢梁结构及其施工方法
FU WUXU (author) / ZHENG ZUOLONG (author) / SHEN JIANQUAN (author) / WANG SHIZHOU (author) / XIE ZHIHENG (author) / ZHANG XIN (author) / ZHANG WENJIAN (author) / WANG MIN (author) / HUANG YIKAI (author)
2021-09-07
Patent
Electronic Resource
Chinese
Folding box house capable of being rapidly hoisted and rapid hoisting method thereof
European Patent Office | 2023
|Folding box house capable of being rapidly hoisted and rapid hoisting method thereof
European Patent Office | 2023
|European Patent Office | 2021
|European Patent Office | 2021
|