Steel structure integral mounting process
The invention discloses a steel structure integral mounting process. The steel structure integral mounting process has the advantages that the high precision is guaranteed, all joints are connected by bolts, the mounting is convenient, the quality is controllable, the inspection is convenient and quick, and the mounting efficiency and the mounting precision are high by taking measures of reserving mounting adjusting gaps, mounting gaskets and the like for the steel structure; according to the technical scheme, the process is implemented according to the following steps of positioning stand column feet and stand columns; placing a positioning fixing ruler in place according to drawing requirements; mounting frame columns; hoisting plant stand columns by using a special hoisting tool, inserting a fixed ruler, and fixing the column feet by using bolts; mounting external wall panels; hoisting the external wall panels in place by using a special clamp, and fixing by using special connecting pieces; mounting cross beams, namely, enabling the cross beams to be placed at the beam column mounting node positions and to be connected through high-strength bolts, and enabling the gaskets to be mounted and plugged tightly; installing floor slabs; adopting a special tool for hoisting the floor plate bodies to the corresponding positions of the cross beams, and adopting high-strength bolts for connection; mounting stairs, namely, hoisting in-place, and carrying out stair mounting; splicing the columns; adopting vertical column connecting nodes for splicing; mounting window boards; and mounting thermal insulation boards.
本发明公开一种钢结构整体安装工艺,对高精度有保证,节点全部采用螺栓连接安装方便,质量可控,检查方便快捷,钢结构预留安装调整空隙,安装垫片等措施,安装效率及精度高;采用的技术方案为:按下述步骤实施,立柱脚及立柱定位;根据图纸要求放置定位固定尺到位;框架柱安装;厂房立柱使用专用吊装工具吊装,插入固定尺,螺栓固定柱脚;外墙板安装;专用夹具吊装外墙板就位,使用专用连接件固定;横梁的安装;横梁放置于梁柱安装节点位置,高强螺栓连接,垫片安装塞紧;楼板安装;专用工具吊装楼层板本体放置于横梁对应位置,高强螺栓连接;楼梯安装;吊装就位楼梯安装;柱拼接;采用立柱连接节点拼接;窗台板安装;保温板安装。
Steel structure integral mounting process
The invention discloses a steel structure integral mounting process. The steel structure integral mounting process has the advantages that the high precision is guaranteed, all joints are connected by bolts, the mounting is convenient, the quality is controllable, the inspection is convenient and quick, and the mounting efficiency and the mounting precision are high by taking measures of reserving mounting adjusting gaps, mounting gaskets and the like for the steel structure; according to the technical scheme, the process is implemented according to the following steps of positioning stand column feet and stand columns; placing a positioning fixing ruler in place according to drawing requirements; mounting frame columns; hoisting plant stand columns by using a special hoisting tool, inserting a fixed ruler, and fixing the column feet by using bolts; mounting external wall panels; hoisting the external wall panels in place by using a special clamp, and fixing by using special connecting pieces; mounting cross beams, namely, enabling the cross beams to be placed at the beam column mounting node positions and to be connected through high-strength bolts, and enabling the gaskets to be mounted and plugged tightly; installing floor slabs; adopting a special tool for hoisting the floor plate bodies to the corresponding positions of the cross beams, and adopting high-strength bolts for connection; mounting stairs, namely, hoisting in-place, and carrying out stair mounting; splicing the columns; adopting vertical column connecting nodes for splicing; mounting window boards; and mounting thermal insulation boards.
本发明公开一种钢结构整体安装工艺,对高精度有保证,节点全部采用螺栓连接安装方便,质量可控,检查方便快捷,钢结构预留安装调整空隙,安装垫片等措施,安装效率及精度高;采用的技术方案为:按下述步骤实施,立柱脚及立柱定位;根据图纸要求放置定位固定尺到位;框架柱安装;厂房立柱使用专用吊装工具吊装,插入固定尺,螺栓固定柱脚;外墙板安装;专用夹具吊装外墙板就位,使用专用连接件固定;横梁的安装;横梁放置于梁柱安装节点位置,高强螺栓连接,垫片安装塞紧;楼板安装;专用工具吊装楼层板本体放置于横梁对应位置,高强螺栓连接;楼梯安装;吊装就位楼梯安装;柱拼接;采用立柱连接节点拼接;窗台板安装;保温板安装。
Steel structure integral mounting process
一种钢结构整体安装工艺
WANG YU (author) / YANG WENCHAO (author)
2021-09-07
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel structure integral moving type mounting equipment and method
European Patent Office | 2024
|Steel structure bridge truss mounting system and mounting process
European Patent Office | 2022
|Quickly-mounted steel column mounting structure and mounting process thereof
European Patent Office | 2022
|Steel box girder bridge deck integral lifting structure and mounting method
European Patent Office | 2024
|