A platform for research: civil engineering, architecture and urbanism
Super-long basement wall crack control device and construction method thereof
The invention discloses a super-long basement wall crack control device and a construction method thereof, and belongs to the technical field of wall maintenance control. The super-long basement wall crack control device comprises a PVC mold sleeve, wherein a fixed adsorption plate is arranged on the top of the PVC mold sleeve, a PVC conveying pipeline is arranged in the PVC mold sleeve, water dripping holes are formed in the bottom of the PVC conveying pipeline at intervals, and a flow guide plate is arranged at the bottom of the PVC mold sleeve. According to the super-long basement wall crack control device, the PVC mold sleeve and the flow guide plate are adopted, so that maintenance liquid which flows out of the fixed-distance water dripping holes of the pipeline can be evenly dispersed and slides downwards along a wall so as to form a maintenance curtain with the uniform thickness, the basement wall construction quality is guaranteed, cracks caused by uneven maintenance are avoided, manual maintenance is replaced by mechanical automatic maintenance, and a specific maintenance period is set so as to overcome the defects of manual maintenance; and the super-long basement wall crack control device has the advantages of high construction efficiency, good construction quality, low cost, easiness in operation, environmental friendliness, cycle sustainability and the like.
本发明公开了一种超长地下室墙壁裂缝控制装置及其施工方法,属于墙壁养护控制技术领域。本发明包括PVC模具套管,所述的PVC模具套管的顶部设置有固定吸附板,PVC模具套管的内部设置有PVC输送管道,PVC输送管道的底部间隔开设有滴水孔,所述的PVC模具套管的底部设置有导流板。本发明采用PVC模具套管以及导流板,能够均匀分散来自管道定距滴水孔流出的养护液,并通过墙壁下滑形成均匀厚度的养护帷幕,保障了地下室墙壁施工质量,避免因养护不均匀产生裂缝,采用替代人工养护的机械自动化养护,设置特定养护时段弥补人工养护的不足,具有施工效率高,施工质量好,成本低廉,操作简单,绿色环保,循环可持续等优点。
Super-long basement wall crack control device and construction method thereof
The invention discloses a super-long basement wall crack control device and a construction method thereof, and belongs to the technical field of wall maintenance control. The super-long basement wall crack control device comprises a PVC mold sleeve, wherein a fixed adsorption plate is arranged on the top of the PVC mold sleeve, a PVC conveying pipeline is arranged in the PVC mold sleeve, water dripping holes are formed in the bottom of the PVC conveying pipeline at intervals, and a flow guide plate is arranged at the bottom of the PVC mold sleeve. According to the super-long basement wall crack control device, the PVC mold sleeve and the flow guide plate are adopted, so that maintenance liquid which flows out of the fixed-distance water dripping holes of the pipeline can be evenly dispersed and slides downwards along a wall so as to form a maintenance curtain with the uniform thickness, the basement wall construction quality is guaranteed, cracks caused by uneven maintenance are avoided, manual maintenance is replaced by mechanical automatic maintenance, and a specific maintenance period is set so as to overcome the defects of manual maintenance; and the super-long basement wall crack control device has the advantages of high construction efficiency, good construction quality, low cost, easiness in operation, environmental friendliness, cycle sustainability and the like.
本发明公开了一种超长地下室墙壁裂缝控制装置及其施工方法,属于墙壁养护控制技术领域。本发明包括PVC模具套管,所述的PVC模具套管的顶部设置有固定吸附板,PVC模具套管的内部设置有PVC输送管道,PVC输送管道的底部间隔开设有滴水孔,所述的PVC模具套管的底部设置有导流板。本发明采用PVC模具套管以及导流板,能够均匀分散来自管道定距滴水孔流出的养护液,并通过墙壁下滑形成均匀厚度的养护帷幕,保障了地下室墙壁施工质量,避免因养护不均匀产生裂缝,采用替代人工养护的机械自动化养护,设置特定养护时段弥补人工养护的不足,具有施工效率高,施工质量好,成本低廉,操作简单,绿色环保,循环可持续等优点。
Super-long basement wall crack control device and construction method thereof
一种超长地下室墙壁裂缝控制装置及其施工方法
SHI WENJUN (author)
2021-09-07
Patent
Electronic Resource
Chinese
Super-long post-cast strip-free basement exterior wall crack control construction method
European Patent Office | 2023
|Basement wall water seepage crack blocking construction method
European Patent Office | 2024
|Concrete basement outer wall crack induction structure and construction method thereof
European Patent Office | 2024
|Anti-crack construction method for basement concrete outer wall
European Patent Office | 2022
|