A platform for research: civil engineering, architecture and urbanism
Suspension bridge gravity type anchorage and tunnel combined structure and co-construction method thereof
The invention discloses a suspension bridge gravity type anchorage and tunnel combined structure and a co-construction method thereof, and relates to the technical field of bridge engineering. The co-construction method comprises the steps: excavating a foundation pit in a mountain; then, pouring an anchorage foundation with a tunnel into the foundation pit; communicating the tunnel in the anchorage foundation with the tunnel in the mountain; and finally, pouring an anchor body on the foundation. The anchor body comprises an anchor block which is located above the foundation and used for anchoring a main cable strand, a splay cable saddle buttress which is supported at the front end of the anchorage foundation and used for supporting a splay cable saddle structure, and an anchor chamber which is located between the anchor block and the splay cable saddle buttress and used for protecting a main cable structure. According to the method, the tunnel and the anchorage are built together, and compared with a conventional gravity type anchorage building scheme, the foundation excavation amount is saved, and disturbance to the environment in the construction process is relatively small.
本发明公开了一种悬索桥重力式锚碇与隧道组合结构及其共建方法,涉及桥梁工程技术领域。其共建方法包括:在山体里开挖基坑;然后向基坑里浇筑带有隧道的锚碇基础;将锚碇基础中的隧道于山体里的隧道连通;最后在基础上浇筑锚体。所述锚体包括:位于基础上方用于锚固主缆索股的锚块、支撑于锚碇基础前端用于支承散索鞍结构的散索鞍支墩、位于锚块与散索鞍支墩之间用于保护主缆结构的锚室。本发明中将隧道与锚碇合建在一起,相较于常规重力式锚碇的建造方案,本发明节省了地基开挖量且施工过程中对环境的扰动相对较小。
Suspension bridge gravity type anchorage and tunnel combined structure and co-construction method thereof
The invention discloses a suspension bridge gravity type anchorage and tunnel combined structure and a co-construction method thereof, and relates to the technical field of bridge engineering. The co-construction method comprises the steps: excavating a foundation pit in a mountain; then, pouring an anchorage foundation with a tunnel into the foundation pit; communicating the tunnel in the anchorage foundation with the tunnel in the mountain; and finally, pouring an anchor body on the foundation. The anchor body comprises an anchor block which is located above the foundation and used for anchoring a main cable strand, a splay cable saddle buttress which is supported at the front end of the anchorage foundation and used for supporting a splay cable saddle structure, and an anchor chamber which is located between the anchor block and the splay cable saddle buttress and used for protecting a main cable structure. According to the method, the tunnel and the anchorage are built together, and compared with a conventional gravity type anchorage building scheme, the foundation excavation amount is saved, and disturbance to the environment in the construction process is relatively small.
本发明公开了一种悬索桥重力式锚碇与隧道组合结构及其共建方法,涉及桥梁工程技术领域。其共建方法包括:在山体里开挖基坑;然后向基坑里浇筑带有隧道的锚碇基础;将锚碇基础中的隧道于山体里的隧道连通;最后在基础上浇筑锚体。所述锚体包括:位于基础上方用于锚固主缆索股的锚块、支撑于锚碇基础前端用于支承散索鞍结构的散索鞍支墩、位于锚块与散索鞍支墩之间用于保护主缆结构的锚室。本发明中将隧道与锚碇合建在一起,相较于常规重力式锚碇的建造方案,本发明节省了地基开挖量且施工过程中对环境的扰动相对较小。
Suspension bridge gravity type anchorage and tunnel combined structure and co-construction method thereof
一种悬索桥重力式锚碇与隧道组合结构及其共建方法
WANG WEI (author) / LIU KEFENG (author) / YANG GUANGWU (author) / MEI XINYONG (author) / ZHENG YAPENG (author) / LIU QISHUN (author) / LI LIN (author) / ZOU MINYONG (author)
2021-09-14
Patent
Electronic Resource
Chinese
Suspension bridge gravity type anchorage and construction method thereof
European Patent Office | 2022
|Suspension bridge tunnel type anchorage and construction method
European Patent Office | 2024
|Suspension bridge tunnel type anchorage and construction method
European Patent Office | 2024
|Construction method for gravity type anchorage of suspension bridge
European Patent Office | 2022
|Construction method for suspension bridge gravity type anchorage porous annular foundations
European Patent Office | 2020
|