A platform for research: civil engineering, architecture and urbanism
Roadbed greening protection slope, construction method thereof and road
The invention provides a roadbed greening protection slope, a construction method thereof and a road. The roadbed greening protection slope comprises a slope body, the slope body is provided with a culvert, the part, located on the top side of the culvert, of the slope body is provided with a water collecting bin, the water collecting bin is connected with a first water drainage pipe arranged in the length direction of the slope body, and the first water drainage pipe is provided with a plurality of water drainage openings in the length direction of the first water drainage pipe. According to the roadbed greening protection slope, rainwater is collected and stored through the water collecting bin, the rainwater drops to different positions of the slope body through the multiple water drainage openings of the first water drainage pipe, the slope body is prevented from being washed by the rainwater, meanwhile, water is supplied to vegetation on the slope body, and normal growth of the vegetation is guaranteed.
本发明提供一种路基绿化护坡及其施工方法、公路。该路基绿化护坡包括坡体,所述坡体设有涵洞,位于所述涵洞的顶侧的所述坡体设有集水仓,所述集水仓连接有沿所述坡体的长度方向设置的第一排水管,沿所述第一排水管的长度方向所述第一排水管设有多个排水口。本发明实现集水仓对雨水的收集和存储,并通过第一排水管的多个排水口将雨水滴落至坡体的不同位置,防止雨水对坡体的冲刷,同时对坡体上的植被进行供水,保证植被的正常生长。
Roadbed greening protection slope, construction method thereof and road
The invention provides a roadbed greening protection slope, a construction method thereof and a road. The roadbed greening protection slope comprises a slope body, the slope body is provided with a culvert, the part, located on the top side of the culvert, of the slope body is provided with a water collecting bin, the water collecting bin is connected with a first water drainage pipe arranged in the length direction of the slope body, and the first water drainage pipe is provided with a plurality of water drainage openings in the length direction of the first water drainage pipe. According to the roadbed greening protection slope, rainwater is collected and stored through the water collecting bin, the rainwater drops to different positions of the slope body through the multiple water drainage openings of the first water drainage pipe, the slope body is prevented from being washed by the rainwater, meanwhile, water is supplied to vegetation on the slope body, and normal growth of the vegetation is guaranteed.
本发明提供一种路基绿化护坡及其施工方法、公路。该路基绿化护坡包括坡体,所述坡体设有涵洞,位于所述涵洞的顶侧的所述坡体设有集水仓,所述集水仓连接有沿所述坡体的长度方向设置的第一排水管,沿所述第一排水管的长度方向所述第一排水管设有多个排水口。本发明实现集水仓对雨水的收集和存储,并通过第一排水管的多个排水口将雨水滴落至坡体的不同位置,防止雨水对坡体的冲刷,同时对坡体上的植被进行供水,保证植被的正常生长。
Roadbed greening protection slope, construction method thereof and road
路基绿化护坡及其施工方法、公路
MAO JIAXING (author) / LIU GUOQUAN (author) / LU QITENG (author)
2021-09-14
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
A01G
Gartenbau
,
HORTICULTURE
/
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
/
E03F
SEWERS
,
Abwasserkanäle
Earthquake fault zone roadbed high slope greening protection method
European Patent Office | 2022
|Roadbed slope protection device and roadbed slope protection method
European Patent Office | 2021
|Roadbed slope protection system and construction method thereof
European Patent Office | 2024
|Roadbed slope protection method and roadbed slope structure
European Patent Office | 2023
|