A platform for research: civil engineering, architecture and urbanism
Building deformation joint concrete double-wall synchronous pouring construction structure and method
The invention provides a building deformation joint concrete double-wall synchronous pouring construction structure and method. The structure comprises a deformation joint main steel mold and a deformation joint auxiliary steel mold; the deformation joint main steel mold is arranged to be of a square steel mold plate structure, the deformation joint auxiliary steel mold is arranged to be of a square steel mold plate structure, and the deformation joint main steel mold and the deformation joint auxiliary steel mold are the same in structure; a formwork support is a common reinforced concrete cast-in-place wall formwork system, the turnover frequency is high, and materials are saved; and no special requirement for constructors and machines and tools exists, a middle deformation joint inner supporting formwork is used in cooperation with the main steel mold and the auxiliary steel mold and fixed through a crack clip pin shaped like a Chinese character 'Hui', operation is easy and convenient, the construction efficiency is high, stability is high, and the quality can be guaranteed.
本发明提供一种建筑变形缝混凝土双墙同步浇筑施工结构及方法,该结构包括:变形缝主钢模和变形缝副钢模;所述变形缝主钢模设置为方形钢模板结构,且变形缝副钢模设置为方形钢模板结构,变形缝主钢模与变形缝副钢模结构相同;模板支撑为普通钢筋混凝土现浇墙体支模体系,周转次数多、节材;对施工人员和机具无特殊要求,对中间变形缝内支撑模板采用主副钢模配合使用,用夹缝回形卡销进行固定,操作简便、施工效率高,稳定性高,质量能够保证。
Building deformation joint concrete double-wall synchronous pouring construction structure and method
The invention provides a building deformation joint concrete double-wall synchronous pouring construction structure and method. The structure comprises a deformation joint main steel mold and a deformation joint auxiliary steel mold; the deformation joint main steel mold is arranged to be of a square steel mold plate structure, the deformation joint auxiliary steel mold is arranged to be of a square steel mold plate structure, and the deformation joint main steel mold and the deformation joint auxiliary steel mold are the same in structure; a formwork support is a common reinforced concrete cast-in-place wall formwork system, the turnover frequency is high, and materials are saved; and no special requirement for constructors and machines and tools exists, a middle deformation joint inner supporting formwork is used in cooperation with the main steel mold and the auxiliary steel mold and fixed through a crack clip pin shaped like a Chinese character 'Hui', operation is easy and convenient, the construction efficiency is high, stability is high, and the quality can be guaranteed.
本发明提供一种建筑变形缝混凝土双墙同步浇筑施工结构及方法,该结构包括:变形缝主钢模和变形缝副钢模;所述变形缝主钢模设置为方形钢模板结构,且变形缝副钢模设置为方形钢模板结构,变形缝主钢模与变形缝副钢模结构相同;模板支撑为普通钢筋混凝土现浇墙体支模体系,周转次数多、节材;对施工人员和机具无特殊要求,对中间变形缝内支撑模板采用主副钢模配合使用,用夹缝回形卡销进行固定,操作简便、施工效率高,稳定性高,质量能够保证。
Building deformation joint concrete double-wall synchronous pouring construction structure and method
一种建筑变形缝混凝土双墙同步浇筑施工结构及方法
YANG LEI (author) / LYU MING (author) / AN JIAN (author) / HU SEN (author) / YANG FAN (author) / YE JIANHUA (author) / YANG DONGHAI (author) / LUO CHAOHU (author) / XU GUANGMING (author) / SUN LING (author)
2021-09-14
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Wall column joint concrete pouring structure and pouring method
European Patent Office | 2024
|European Patent Office | 2024
|