A platform for research: civil engineering, architecture and urbanism
The invention relates to a prefabricated building structure. The prefabricated building structure comprises a pile body, a pile hoop and a first anchoring rib, and the pile hoop is arranged on the peripheral wall of the end of the pile body; the pile hoop comprises a first hoop section sunken in the axis direction of the pile body and a second hoop section protruding outwards relative to the first hoop section, the first hoop section and the second hoop section are arranged in a spaced mode, and a step is formed on the inner wall of the pile hoop between the first hoop section and the second hoop section. The two ends of the first anchoring rib are welded and fixed to the opposite positions of the step on the pile hoop correspondingly. The first anchoring rib is welded and fixed to the step on the pile hoop, an operator can directly place the first anchoring rib on the step for welding, the step can play a role in supporting the first anchoring rib, and welding is facilitated for the operator; and the first anchoring rib is welded to the step of the pile hoop, so that welding area between the first anchoring rib and the pile hoop can be increased, and welding strength is improved.
本发明涉及一种预制建筑结构,包括桩体、桩套箍及第一锚固筋,桩套箍设置在桩体端部的外周壁上;桩套箍包括向桩体轴心方向凹陷的第一箍节,以及相对于第一箍节外凸的第二箍节,第一箍节与第二箍节间隔设置,且第一箍节与第二箍节之间在桩套箍的内壁上形成台阶;第一锚固筋的两端分别焊接固定于桩套箍相对的台阶处。将第一锚固筋焊接固定于桩套箍上的台阶处,操作者能够将第一锚固筋直接放置在台阶上进行焊接,台阶能够起到支承第一锚固筋的作用,便于操作者焊接;而且将第一锚固筋焊接在桩套箍的台阶处能够增加第一锚固筋与桩套箍之间的焊接面积,提高焊接强度。
The invention relates to a prefabricated building structure. The prefabricated building structure comprises a pile body, a pile hoop and a first anchoring rib, and the pile hoop is arranged on the peripheral wall of the end of the pile body; the pile hoop comprises a first hoop section sunken in the axis direction of the pile body and a second hoop section protruding outwards relative to the first hoop section, the first hoop section and the second hoop section are arranged in a spaced mode, and a step is formed on the inner wall of the pile hoop between the first hoop section and the second hoop section. The two ends of the first anchoring rib are welded and fixed to the opposite positions of the step on the pile hoop correspondingly. The first anchoring rib is welded and fixed to the step on the pile hoop, an operator can directly place the first anchoring rib on the step for welding, the step can play a role in supporting the first anchoring rib, and welding is facilitated for the operator; and the first anchoring rib is welded to the step of the pile hoop, so that welding area between the first anchoring rib and the pile hoop can be increased, and welding strength is improved.
本发明涉及一种预制建筑结构,包括桩体、桩套箍及第一锚固筋,桩套箍设置在桩体端部的外周壁上;桩套箍包括向桩体轴心方向凹陷的第一箍节,以及相对于第一箍节外凸的第二箍节,第一箍节与第二箍节间隔设置,且第一箍节与第二箍节之间在桩套箍的内壁上形成台阶;第一锚固筋的两端分别焊接固定于桩套箍相对的台阶处。将第一锚固筋焊接固定于桩套箍上的台阶处,操作者能够将第一锚固筋直接放置在台阶上进行焊接,台阶能够起到支承第一锚固筋的作用,便于操作者焊接;而且将第一锚固筋焊接在桩套箍的台阶处能够增加第一锚固筋与桩套箍之间的焊接面积,提高焊接强度。
Prefabricated building prefabricated wallboard structure
European Patent Office | 2023
|Skeleton structure for prefabricated building and prefabricated building
European Patent Office | 2020
|