A platform for research: civil engineering, architecture and urbanism
Installation structure of heavy hoisting masonry stone curtain wall
The invention discloses an installation structure of a heavy hoisting masonry stone curtain wall. The installation structure comprises a curtain wall frame, large stone lines, small stone lines and masonry stone plates. The curtain wall frame is fixedly installed on a building body and composed of a plurality of stand columns and cross beams. The large stone lines are fixedly installed on the cross beams through screw hanging assemblies and hanging assemblies, the small stone lines are fixedly installed on the cross beams through screw hanging assemblies, the masonry stone plates are arranged between the large stone lines and the small stone lines, and the masonry stone plates are fixedly installed on the cross beams through pulling assemblies; and supporting plate assemblies are arranged at the bottoms of the small stone lines and the bottoms of the masonry stone plates. According to the scheme, the main stress of the stone curtain wall can be transferred to the building body to the maximum extent, the safety of the whole load is improved, the stability of each stone plate is guaranteed, the construction efficiency is improved, construction materials and manpower are structurally saved, and the requirements of the development trend of green buildings are met.
本发明公开了一种重型吊装砌筑石材幕墙的安装结构,包含幕墙框架、大石材线条、小石材线条和砌筑石材板块;幕墙框架固定安装在建筑主体上,幕墙框架由多根立柱和横梁组成;大石材线条通过螺杆挂接组件和吊挂组件固定安装在横梁上,小石材线条通过螺杆挂接组件固定安装在横梁上,砌筑石材板块设置在大石材线条和小石材线条之间,砌筑石材板块通过拉结组件固定安装在横梁上,小石材线条和砌筑石材板块的底部均设置有托板组件;本方案使石材幕墙的主要受力可以最大程度转移到建筑主体上,提高了整体负载的安全性,并保证每个石材板块的稳定性,提高了施工效率,结构上节省了施工材料和人力,符合绿色建筑的发展趋势要求。
Installation structure of heavy hoisting masonry stone curtain wall
The invention discloses an installation structure of a heavy hoisting masonry stone curtain wall. The installation structure comprises a curtain wall frame, large stone lines, small stone lines and masonry stone plates. The curtain wall frame is fixedly installed on a building body and composed of a plurality of stand columns and cross beams. The large stone lines are fixedly installed on the cross beams through screw hanging assemblies and hanging assemblies, the small stone lines are fixedly installed on the cross beams through screw hanging assemblies, the masonry stone plates are arranged between the large stone lines and the small stone lines, and the masonry stone plates are fixedly installed on the cross beams through pulling assemblies; and supporting plate assemblies are arranged at the bottoms of the small stone lines and the bottoms of the masonry stone plates. According to the scheme, the main stress of the stone curtain wall can be transferred to the building body to the maximum extent, the safety of the whole load is improved, the stability of each stone plate is guaranteed, the construction efficiency is improved, construction materials and manpower are structurally saved, and the requirements of the development trend of green buildings are met.
本发明公开了一种重型吊装砌筑石材幕墙的安装结构,包含幕墙框架、大石材线条、小石材线条和砌筑石材板块;幕墙框架固定安装在建筑主体上,幕墙框架由多根立柱和横梁组成;大石材线条通过螺杆挂接组件和吊挂组件固定安装在横梁上,小石材线条通过螺杆挂接组件固定安装在横梁上,砌筑石材板块设置在大石材线条和小石材线条之间,砌筑石材板块通过拉结组件固定安装在横梁上,小石材线条和砌筑石材板块的底部均设置有托板组件;本方案使石材幕墙的主要受力可以最大程度转移到建筑主体上,提高了整体负载的安全性,并保证每个石材板块的稳定性,提高了施工效率,结构上节省了施工材料和人力,符合绿色建筑的发展趋势要求。
Installation structure of heavy hoisting masonry stone curtain wall
一种重型吊装砌筑石材幕墙的安装结构
ZHAO JIANGHUA (author) / YUAN ZHIFANG (author) / YANG JIAO (author) / ZHANG YUANYUAN (author) / CHEN TING (author) / JIANG XIN (author)
2021-09-17
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Installation method of fabricated masonry stone curtain wall
European Patent Office | 2022
|Curtain wall hoisting device and installation construction method thereof
European Patent Office | 2023
|Energy-saving curtain wall hoisting equipment and curtain wall hoisting construction method
European Patent Office | 2021
|