A platform for research: civil engineering, architecture and urbanism
The invention discloses a hoop connecting structure for connecting a grid structure ceiling and a transfer layer. The hoop connecting structure for connecting the grid structure ceiling and the transfer layer comprises a first hoop and a second hoop, the first hoop and the second hoop are movably connected through a rotating shaft, the right side of the first hoop and the right side of the second hoop are in threaded connection with a first fastening bolt, and the bottom of the second hoop is fixedly connected with a base. According to the hoop connecting structure for connecting the grid structure ceiling and the transfer layer, a ball point is fixed through the first hoop and the second hoop, the first hoop and the second hoop are fixed through the first fastening bolt, and then a cross beam and the base are fixed through a second fastening bolt, so that fixation of a keel placing groove is achieved, fixation of the keel and pulling of a telescopic rod in the later period are facilitated, and practicability is high, the telescopic rod drives a movable rod and a fixed frame to move, counter-acting force generated by a first reset spring can drive the fixed frame to reset, therefore the keels can be conveniently fixed, construction is convenient, and problems that in the prior art, main keels and auxiliary keels are inconvenient to install in the later period, and ceiling boards are inconvenient to fix are solved.
本发明公开了网架结构吊顶与转换层连接的抱箍连接结构,包括第一抱箍和第二抱箍,所述第一抱箍和第二抱箍之间通过转轴活动连接,第一抱箍与第二抱箍的右侧螺纹连接有第一紧固螺栓,第二抱箍的底部固定连接有底座。本发明通过第一抱箍和第二抱箍对球点处进行固定,第一紧固螺栓对第一抱箍和第二抱箍进行固定,然后通过第二紧固螺栓对横梁和底座进行固定,从而实现对龙骨放置槽的固定,方便后期对龙骨进行固定,拉动伸缩杆,伸缩杆带动活动杆和固定框运动,第一复位弹簧产生的反作用力会带动固定框复位,从而便于对龙骨进行固定,方便施工,解决了现有技术中的抱箍不便于后期安装主副龙骨,也就不便于吊顶板材的固定的问题。
The invention discloses a hoop connecting structure for connecting a grid structure ceiling and a transfer layer. The hoop connecting structure for connecting the grid structure ceiling and the transfer layer comprises a first hoop and a second hoop, the first hoop and the second hoop are movably connected through a rotating shaft, the right side of the first hoop and the right side of the second hoop are in threaded connection with a first fastening bolt, and the bottom of the second hoop is fixedly connected with a base. According to the hoop connecting structure for connecting the grid structure ceiling and the transfer layer, a ball point is fixed through the first hoop and the second hoop, the first hoop and the second hoop are fixed through the first fastening bolt, and then a cross beam and the base are fixed through a second fastening bolt, so that fixation of a keel placing groove is achieved, fixation of the keel and pulling of a telescopic rod in the later period are facilitated, and practicability is high, the telescopic rod drives a movable rod and a fixed frame to move, counter-acting force generated by a first reset spring can drive the fixed frame to reset, therefore the keels can be conveniently fixed, construction is convenient, and problems that in the prior art, main keels and auxiliary keels are inconvenient to install in the later period, and ceiling boards are inconvenient to fix are solved.
本发明公开了网架结构吊顶与转换层连接的抱箍连接结构,包括第一抱箍和第二抱箍,所述第一抱箍和第二抱箍之间通过转轴活动连接,第一抱箍与第二抱箍的右侧螺纹连接有第一紧固螺栓,第二抱箍的底部固定连接有底座。本发明通过第一抱箍和第二抱箍对球点处进行固定,第一紧固螺栓对第一抱箍和第二抱箍进行固定,然后通过第二紧固螺栓对横梁和底座进行固定,从而实现对龙骨放置槽的固定,方便后期对龙骨进行固定,拉动伸缩杆,伸缩杆带动活动杆和固定框运动,第一复位弹簧产生的反作用力会带动固定框复位,从而便于对龙骨进行固定,方便施工,解决了现有技术中的抱箍不便于后期安装主副龙骨,也就不便于吊顶板材的固定的问题。
Hoop connecting structure for connecting grid structure ceiling and transfer layer
网架结构吊顶与转换层连接的抱箍连接结构
2021-09-17
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Spherical hoop suspended ceiling connecting structure and connecting method thereof
European Patent Office | 2022
|European Patent Office | 2024
|Hoop and universal joint assembly connecting aluminum plate suspended ceiling system
European Patent Office | 2024
|