The invention provides an excavation method of a roadbed adjacent to an existing railway. The excavation method of the roadbed adjacent to the existing railway comprises the following steps of arranging a fixed blocking piece on one side, close to a new railway line, of an existing railway line, wherein the fixed blocking piece and the existing railway line are arranged at a first preset distance; arranging a movable blocking piece between the fixed blocking piece and the new railway line, wherein the distance between the movable blocking piece and the fixed blocking piece can be adjusted along with construction; performing excavation by using a breaking hammer or static blasting excavation when the distance between the existing railway line and the new railway line is smaller than a second preset distance; and performing step-by-step reserved partition wall excavation when the distance between the existing railway line and the new railway line is larger than the second preset distance and is smaller than a third preset distance. The excavation method of the roadbed adjacent to the existing railway has the advantage of simplicity, and the situation that side slope mudstone rolls down to cause danger or influence normal operation of the existing railway line can be prevented.
本发明提供一种邻近既有铁路路基开挖方法,邻近既有铁路路基开挖方法包括在所述既有轨道线靠近新轨道线的一侧设置固定挡件,固定挡件与既有轨道线间隔第一预设距离设置;在固定挡件与新轨道线之间设置活动挡件,活动挡件与固定挡件之间的距离能够随着施工而调整;当既有轨道线与新轨道线距离小于第二预设距离时,采用破碎锤开挖或者静态爆破开挖;当既有轨道线与新轨道线距离大于第二预设距离并且小于第三预设距离时,采用分台阶预留隔墙开挖。该邻近既有铁路路基开挖方法具有挖掘方法简单,能够防止边坡泥石滚落造成危险或影响既有轨道线的正常运行的优点。
The invention provides an excavation method of a roadbed adjacent to an existing railway. The excavation method of the roadbed adjacent to the existing railway comprises the following steps of arranging a fixed blocking piece on one side, close to a new railway line, of an existing railway line, wherein the fixed blocking piece and the existing railway line are arranged at a first preset distance; arranging a movable blocking piece between the fixed blocking piece and the new railway line, wherein the distance between the movable blocking piece and the fixed blocking piece can be adjusted along with construction; performing excavation by using a breaking hammer or static blasting excavation when the distance between the existing railway line and the new railway line is smaller than a second preset distance; and performing step-by-step reserved partition wall excavation when the distance between the existing railway line and the new railway line is larger than the second preset distance and is smaller than a third preset distance. The excavation method of the roadbed adjacent to the existing railway has the advantage of simplicity, and the situation that side slope mudstone rolls down to cause danger or influence normal operation of the existing railway line can be prevented.
本发明提供一种邻近既有铁路路基开挖方法,邻近既有铁路路基开挖方法包括在所述既有轨道线靠近新轨道线的一侧设置固定挡件,固定挡件与既有轨道线间隔第一预设距离设置;在固定挡件与新轨道线之间设置活动挡件,活动挡件与固定挡件之间的距离能够随着施工而调整;当既有轨道线与新轨道线距离小于第二预设距离时,采用破碎锤开挖或者静态爆破开挖;当既有轨道线与新轨道线距离大于第二预设距离并且小于第三预设距离时,采用分台阶预留隔墙开挖。该邻近既有铁路路基开挖方法具有挖掘方法简单,能够防止边坡泥石滚落造成危险或影响既有轨道线的正常运行的优点。
Excavation method of roadbed adjacent to existing railway
邻近既有铁路路基开挖方法
2021-09-21
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Effect Analysis on Foundation Pit Excavation Adjacent to Existing Railway
Trans Tech Publications | 2013
|Effect Analysis on Foundation Pit Excavation Adjacent to Existing Railway
Tema Archive | 2013
|Light supporting structure for existing railway station roadbed on filling roadbed
European Patent Office | 2015
|Effect Analysis on Foundation Pit Excavation Adjacent to Existing Railway
British Library Conference Proceedings | 2013
|