A platform for research: civil engineering, architecture and urbanism
Basement dewatering well plugging method and plugging assembly
The invention discloses a basement dewatering well plugging method which comprises the steps that after cushion concrete is poured, a waterproof roll is laid on the surface of the cushion concrete, a waterproof roll joint is reserved at the position of a water pumping opening of a sleeve, after dewatering, the water pumping opening is plugged through a plug, the waterproof roll joint is subjected to head closing, and then overground concrete pouring is conducted. According to the basement dewatering well plugging method, the waterproof roll joint on the plug and the waterproof roll on the cushion concrete are of an integrated structure, and therefore the waterproof effect can be improved. According to the basement dewatering well plugging method, three kinds of plugging are included, the first kind of plugging is plugging by the integrated waterproof roll, the second kind of plugging is plugging by a screw cap, and the third kind of plugging is plugging through the overground concrete. The three kinds of plugging can effectively reduce the water seepage amount of a dewatering well, and the waterproof grade of the plugged dewatering well is improved. The invention further discloses a basement dewatering well plugging assembly.
本发明公开了一种地下室降水井封堵方法,包括:在浇筑垫层混凝土后,在垫层混凝土表面铺设防水卷材,并且在套管的抽水口位置预留防水卷材接茬,待降水后,通过堵头将抽水口封堵,对防水卷材接茬进行收头,之后进行井上混凝土浇筑。在本发明中堵头上的防水卷材接茬与垫层混凝土上的防水卷材为一体结构,因此能够提高防水效果。本发明中包括三道封堵:第一道为一体式防水卷材的的封堵,第二道为丝帽的封堵,第三道为井上混凝土的封堵。三道封堵能够有效地降低降水井的渗水量,提高封堵后的降水井的防水等级。本发明还公开了一种地下室降水井封堵组件。
Basement dewatering well plugging method and plugging assembly
The invention discloses a basement dewatering well plugging method which comprises the steps that after cushion concrete is poured, a waterproof roll is laid on the surface of the cushion concrete, a waterproof roll joint is reserved at the position of a water pumping opening of a sleeve, after dewatering, the water pumping opening is plugged through a plug, the waterproof roll joint is subjected to head closing, and then overground concrete pouring is conducted. According to the basement dewatering well plugging method, the waterproof roll joint on the plug and the waterproof roll on the cushion concrete are of an integrated structure, and therefore the waterproof effect can be improved. According to the basement dewatering well plugging method, three kinds of plugging are included, the first kind of plugging is plugging by the integrated waterproof roll, the second kind of plugging is plugging by a screw cap, and the third kind of plugging is plugging through the overground concrete. The three kinds of plugging can effectively reduce the water seepage amount of a dewatering well, and the waterproof grade of the plugged dewatering well is improved. The invention further discloses a basement dewatering well plugging assembly.
本发明公开了一种地下室降水井封堵方法,包括:在浇筑垫层混凝土后,在垫层混凝土表面铺设防水卷材,并且在套管的抽水口位置预留防水卷材接茬,待降水后,通过堵头将抽水口封堵,对防水卷材接茬进行收头,之后进行井上混凝土浇筑。在本发明中堵头上的防水卷材接茬与垫层混凝土上的防水卷材为一体结构,因此能够提高防水效果。本发明中包括三道封堵:第一道为一体式防水卷材的的封堵,第二道为丝帽的封堵,第三道为井上混凝土的封堵。三道封堵能够有效地降低降水井的渗水量,提高封堵后的降水井的防水等级。本发明还公开了一种地下室降水井封堵组件。
Basement dewatering well plugging method and plugging assembly
一种地下室降水井封堵方法及封堵组件
HAN MINGYU (author) / YAO HUI (author) / MOU YINGCHAO (author) / ZHANG TAO (author) / LI GUOHUI (author) / LI CHAOPENG (author) / HOU ZUNDE (author)
2021-09-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Dewatering well plugging construction method and dewatering well plugging structure
European Patent Office | 2023
|European Patent Office | 2024
|Plugging structure and plugging method for dewatering well
European Patent Office | 2022
|