A platform for research: civil engineering, architecture and urbanism
Energy-saving curtain wall for building
The invention relates to the technical field of building curtain walls, and particularly discloses an energy-saving curtain wall for a building. the energy-saving curtain wall comprises a fixing mechanism and an opening-closing mechanism, wherein the fixing mechanism comprises a fixing base, a supporting hook, an adjusting nail, an adjusting screw and a plurality of glass curtain walls, the glass curtain walls are fixedly connected to the supporting hook, a fixing hook is arranged on the fixing base, the supporting hook is buckled on the fixing hook, a fixing boss is arranged in the center of the top end of the fixing base, the adjusting screw is arranged on the fixing boss, the adjusting nail is arranged on the side face of the fixing boss, the adjusting screw can abut against the adjusting nail, the adjusting nail can abut against the glass curtain walls, the opening-closing mechanism comprises a supporting rod, a synchronous belt and a motor, one end of the supporting rod is connected to the glass curtain walls in a hinged mode, the other end of the supporting rod is connected to the synchronous belt in a hinged mode, and the motor meshes with the synchronous belt. According to the energy-saving curtain wall, the problems that glue needs to be manually filled in installing gaps of the glass curtain walls, the installing time is prolonged, and opening and closing of an opening and closing sash of the glass curtain walls need to be manually operated are solved.
本发明涉及建筑幕墙技术领域,具体公开了一种建筑用节能幕墙;包括固定机构和开合机构;固定机构包括固定底座、支撑钩、调节钉、调节螺钉以及多块玻璃幕墙;玻璃幕墙与支撑钩固定连接,固定底座上设置有固定钩,支撑钩扣在固定钩上;固定底座顶端中央设置有固定凸台,固定凸台上设置有调节螺钉,固定凸台侧面设置有调节钉,调节螺钉可与调节钉相抵,调节钉可抵住玻璃幕墙;开合机构包括支撑杆、同步带、电机;支撑杆一端与玻璃幕墙铰接,另一端与同步带铰接,电机与同步带啮合;本发明解决了玻璃幕墙的安装空隙中需要人工填充胶体,延长安装时间以及玻璃幕墙开合扇需要人工操作开合的问题。
Energy-saving curtain wall for building
The invention relates to the technical field of building curtain walls, and particularly discloses an energy-saving curtain wall for a building. the energy-saving curtain wall comprises a fixing mechanism and an opening-closing mechanism, wherein the fixing mechanism comprises a fixing base, a supporting hook, an adjusting nail, an adjusting screw and a plurality of glass curtain walls, the glass curtain walls are fixedly connected to the supporting hook, a fixing hook is arranged on the fixing base, the supporting hook is buckled on the fixing hook, a fixing boss is arranged in the center of the top end of the fixing base, the adjusting screw is arranged on the fixing boss, the adjusting nail is arranged on the side face of the fixing boss, the adjusting screw can abut against the adjusting nail, the adjusting nail can abut against the glass curtain walls, the opening-closing mechanism comprises a supporting rod, a synchronous belt and a motor, one end of the supporting rod is connected to the glass curtain walls in a hinged mode, the other end of the supporting rod is connected to the synchronous belt in a hinged mode, and the motor meshes with the synchronous belt. According to the energy-saving curtain wall, the problems that glue needs to be manually filled in installing gaps of the glass curtain walls, the installing time is prolonged, and opening and closing of an opening and closing sash of the glass curtain walls need to be manually operated are solved.
本发明涉及建筑幕墙技术领域,具体公开了一种建筑用节能幕墙;包括固定机构和开合机构;固定机构包括固定底座、支撑钩、调节钉、调节螺钉以及多块玻璃幕墙;玻璃幕墙与支撑钩固定连接,固定底座上设置有固定钩,支撑钩扣在固定钩上;固定底座顶端中央设置有固定凸台,固定凸台上设置有调节螺钉,固定凸台侧面设置有调节钉,调节螺钉可与调节钉相抵,调节钉可抵住玻璃幕墙;开合机构包括支撑杆、同步带、电机;支撑杆一端与玻璃幕墙铰接,另一端与同步带铰接,电机与同步带啮合;本发明解决了玻璃幕墙的安装空隙中需要人工填充胶体,延长安装时间以及玻璃幕墙开合扇需要人工操作开合的问题。
Energy-saving curtain wall for building
一种建筑用节能幕墙
LIU QI (author) / LIU HUA (author) / WANG QING (author) / LIU RUIJING (author) / LIU JUNYAN (author) / LIU XIAOHUA (author) / LIU YAYUN (author) / GUO KUN (author) / LONG YUN (author)
2021-09-28
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS