A platform for research: civil engineering, architecture and urbanism
No.0 block bracket structure of high-pier large-span continuous steel structure bridge
The invention discloses a No.0 block bracket structure of a high-pier large-span continuous steel structure bridge, which belongs to the technical field of No.0 block bracket structures. The structure comprises a base, a fixing mechanism is fixedly mounted on the lower end face of the base and used for fixing a whole bracket, a limiting mechanism is mounted at the center of the lower end face of the base and used for limiting the whole bracket, an adjusting mechanism is installed on the upper end face of the base and used for adjusting components above the bracket, a top plate is installed at the upper end of the adjusting mechanism and used for bearing the number block, an outer bracket is installed on the outer side wall of the top plate and the adjusting mechanism, an inner bracket is installed on the inner side wall of the top plate and the adjusting mechanism, and the outer bracket and the inner bracket are used to improve the connection stability of the adjustment mechanism and the top plate. The working stability of the whole bracket is effectively improved, mounting is convenient, height adjustment of the bracket is facilitated, the practicability and applicability of the bracket can be further improved, the construction cost is low, the construction difficulty is low, and actual flood drainage is not affected.
本发明公开了一种高墩大跨度连续钢构桥0号块托架结构,属于0号块托架结构技术领域,包括底座,底座的下端面固定安装有固定机构,固定机构用于固定托架整体,底座下端面中心处安装有限位机构,限位机构用于对托架整体进行限位,底座的上端面安装有调节机构,调节机构用于调节托架上方的部件,调节机构的上端安装有顶板,顶板用于承托号块,顶板与调节机构的外侧壁安装有外托架,顶板与调节机构的内侧壁安装有内托架,外托架和内托架用于提升调节机构和顶板的连接稳固性,本发明有效地提升托架整体的工作稳固性,且便于安装,利于实现托架的高度调节,能够进一步的提升托架的实用性和适用性,施工成本低,施工难度低,不影响实际的排洪。
No.0 block bracket structure of high-pier large-span continuous steel structure bridge
The invention discloses a No.0 block bracket structure of a high-pier large-span continuous steel structure bridge, which belongs to the technical field of No.0 block bracket structures. The structure comprises a base, a fixing mechanism is fixedly mounted on the lower end face of the base and used for fixing a whole bracket, a limiting mechanism is mounted at the center of the lower end face of the base and used for limiting the whole bracket, an adjusting mechanism is installed on the upper end face of the base and used for adjusting components above the bracket, a top plate is installed at the upper end of the adjusting mechanism and used for bearing the number block, an outer bracket is installed on the outer side wall of the top plate and the adjusting mechanism, an inner bracket is installed on the inner side wall of the top plate and the adjusting mechanism, and the outer bracket and the inner bracket are used to improve the connection stability of the adjustment mechanism and the top plate. The working stability of the whole bracket is effectively improved, mounting is convenient, height adjustment of the bracket is facilitated, the practicability and applicability of the bracket can be further improved, the construction cost is low, the construction difficulty is low, and actual flood drainage is not affected.
本发明公开了一种高墩大跨度连续钢构桥0号块托架结构,属于0号块托架结构技术领域,包括底座,底座的下端面固定安装有固定机构,固定机构用于固定托架整体,底座下端面中心处安装有限位机构,限位机构用于对托架整体进行限位,底座的上端面安装有调节机构,调节机构用于调节托架上方的部件,调节机构的上端安装有顶板,顶板用于承托号块,顶板与调节机构的外侧壁安装有外托架,顶板与调节机构的内侧壁安装有内托架,外托架和内托架用于提升调节机构和顶板的连接稳固性,本发明有效地提升托架整体的工作稳固性,且便于安装,利于实现托架的高度调节,能够进一步的提升托架的实用性和适用性,施工成本低,施工难度低,不影响实际的排洪。
No.0 block bracket structure of high-pier large-span continuous steel structure bridge
一种高墩大跨度连续钢构桥0号块托架结构
ZHAO ZHENHONG (author)
2021-10-01
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
No.0 block bracket structure of high-pier large-span continuous steel structure bridge
European Patent Office | 2021
|High-pier continuous steel structure bridge bracket and construction method
European Patent Office | 2021
|European Patent Office | 2023
|European Patent Office | 2022
|Seismic Analysis of High Pier Three-Span Continuous Bridge
British Library Conference Proceedings | 2015
|