A platform for research: civil engineering, architecture and urbanism
The invention discloses an automatic embedding device based on pipeline laying construction and relates to the technical field of pipeline laying construction. Aiming at solving the problems that automatic pipeline embedding cannot be achieved in the traditional pipeline construction process, the following scheme is now put forwards. According to the scheme, the automatic embedding device comprises a shell, a pit digging structure is arranged on the left side of the shell, a landfill structure is arranged below the shell, a pipeline conveying structure is arranged in the shell, and moving mechanisms are arranged on the two sides of the pipeline conveying structure. According to the automatic embedding device, soil in an embedding pit can be automatically conveyed to the rear portion of the shell through mutual cooperation of the installed pit digging structure and the landfill structure, pipelines are automatically embedded, automatic pipe arrangement can be achieved through mutual cooperation of the conveying structure and the moving mechanisms, and the efficiency of pipeline laying construction is improved.
本发明公开了基于管道铺设施工用的自动填埋装置,涉及管道铺设施工技术领域,针对传统的管道施工过程中不能实现管道自动填埋的问题,现提出如下方案,包括壳体,所述壳体的左侧设有挖坑结构,所述壳体的下方设有填埋结构,所述壳体的内部设有管道输送结构,所述管道输送结构的两侧设有移动机构。本发明不仅可以通过安装挖坑结构与填埋结构相互配合,自动将填埋坑内部的泥土输送到壳体后方,自动填埋管道,而且还可以通过输送结构与移动机构相互配合,实现自动排管,提高了管道铺设施工的效率。
The invention discloses an automatic embedding device based on pipeline laying construction and relates to the technical field of pipeline laying construction. Aiming at solving the problems that automatic pipeline embedding cannot be achieved in the traditional pipeline construction process, the following scheme is now put forwards. According to the scheme, the automatic embedding device comprises a shell, a pit digging structure is arranged on the left side of the shell, a landfill structure is arranged below the shell, a pipeline conveying structure is arranged in the shell, and moving mechanisms are arranged on the two sides of the pipeline conveying structure. According to the automatic embedding device, soil in an embedding pit can be automatically conveyed to the rear portion of the shell through mutual cooperation of the installed pit digging structure and the landfill structure, pipelines are automatically embedded, automatic pipe arrangement can be achieved through mutual cooperation of the conveying structure and the moving mechanisms, and the efficiency of pipeline laying construction is improved.
本发明公开了基于管道铺设施工用的自动填埋装置,涉及管道铺设施工技术领域,针对传统的管道施工过程中不能实现管道自动填埋的问题,现提出如下方案,包括壳体,所述壳体的左侧设有挖坑结构,所述壳体的下方设有填埋结构,所述壳体的内部设有管道输送结构,所述管道输送结构的两侧设有移动机构。本发明不仅可以通过安装挖坑结构与填埋结构相互配合,自动将填埋坑内部的泥土输送到壳体后方,自动填埋管道,而且还可以通过输送结构与移动机构相互配合,实现自动排管,提高了管道铺设施工的效率。
Automatic embedding device based on pipeline laying construction
基于管道铺设施工用的自动填埋装置
LI DAWEI (author)
2021-10-01
Patent
Electronic Resource
Chinese
IPC:
E02F
Baggern
,
DREDGING
Pipeline laying device and construction method of pipeline laying
European Patent Office | 2020
|Cushion laying device and laying method for pipeline construction
European Patent Office | 2023
|Pipeline laying device for urban sewage pipeline reconstruction construction
European Patent Office | 2023
|