A platform for research: civil engineering, architecture and urbanism
High-pressure jet grouting pile construction method based on PVC floral tube
The invention provides a high-pressure jet grouting pile construction method based on a PVC floral tube. The method comprises the following steps that 1, geological exploration is conducted on geology needing to be constructed; 2, the PVC floral tube is manufactured; 3, a geological drilling rig is used for drilling a hole in the ground to be constructed, after the hole is drilled to the designed depth, a drill rod of the geological drilling rig is pulled out immediately, and the PVC floral tube with the diameter matched with the hole diameter is inserted into the hole; 4, cement grout is prepared; and 5, a high-pressure jet grouting pile drill bit of a high-pressure jet grouting pile machine is inserted into the inner bottom of the hole, the high-pressure jet grouting pile drill bit conducts high-pressure jet grouting in the hole from bottom to top, and in the high-pressure jet grouting process, the cement grout sprayed out of the high-pressure jet grouting pile machine can cut up the PVC floral tube in the hole. According to the high-pressure jet grouting pile construction method based on the PVC floral tube, the construction efficiency and quality of a high-pressure jet grouting pile can be improved.
本发明提供了一种基于PVC花管的高压旋喷桩施工方法,包括以下步骤:步骤一:对需要进行施工的地质进行地质勘探;步骤二:制作PVC花管;步骤三:通过地质钻机对待施工的地面进行钻孔,钻至设计深度后,立刻拔出地质钻机的钻杆,在孔内插入直径与孔径适配的PVC花管;步骤四:制备水泥浆液;步骤五:把高压旋喷桩机的高压旋喷桩钻头插入孔的内底部,高压旋喷桩钻头在孔内由下往上进行高压旋喷注浆,高压旋喷注浆过程中,高压旋喷桩机喷出的水泥浆液能够将孔内的PVC花管切碎。本发明能够提高高压旋喷桩施工效率和质量。
High-pressure jet grouting pile construction method based on PVC floral tube
The invention provides a high-pressure jet grouting pile construction method based on a PVC floral tube. The method comprises the following steps that 1, geological exploration is conducted on geology needing to be constructed; 2, the PVC floral tube is manufactured; 3, a geological drilling rig is used for drilling a hole in the ground to be constructed, after the hole is drilled to the designed depth, a drill rod of the geological drilling rig is pulled out immediately, and the PVC floral tube with the diameter matched with the hole diameter is inserted into the hole; 4, cement grout is prepared; and 5, a high-pressure jet grouting pile drill bit of a high-pressure jet grouting pile machine is inserted into the inner bottom of the hole, the high-pressure jet grouting pile drill bit conducts high-pressure jet grouting in the hole from bottom to top, and in the high-pressure jet grouting process, the cement grout sprayed out of the high-pressure jet grouting pile machine can cut up the PVC floral tube in the hole. According to the high-pressure jet grouting pile construction method based on the PVC floral tube, the construction efficiency and quality of a high-pressure jet grouting pile can be improved.
本发明提供了一种基于PVC花管的高压旋喷桩施工方法,包括以下步骤:步骤一:对需要进行施工的地质进行地质勘探;步骤二:制作PVC花管;步骤三:通过地质钻机对待施工的地面进行钻孔,钻至设计深度后,立刻拔出地质钻机的钻杆,在孔内插入直径与孔径适配的PVC花管;步骤四:制备水泥浆液;步骤五:把高压旋喷桩机的高压旋喷桩钻头插入孔的内底部,高压旋喷桩钻头在孔内由下往上进行高压旋喷注浆,高压旋喷注浆过程中,高压旋喷桩机喷出的水泥浆液能够将孔内的PVC花管切碎。本发明能够提高高压旋喷桩施工效率和质量。
High-pressure jet grouting pile construction method based on PVC floral tube
一种基于PVC花管的高压旋喷桩施工方法
LI BEN (author) / CHEN HAIYING (author) / CHEN ZHIJIAN (author) / DING YU (author) / LIN ZIJIE (author) / SU WEIXIN (author) / FENG JINGLI (author) / WU RIRONG (author) / GU RIHUI (author) / KUANG WEIQIANG (author)
2021-10-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation pit supporting method for floral tube pile grouting in stone nitrate area
European Patent Office | 2022
|