Sump construction method
The invention provides a sump construction method, and relates to the technical field of pipe gallery installation. The sump construction method comprises the following steps of correspondingly prefabricating a sump and a pipe gallery, digging a foundation pit, and arranging a sump in the foundation pit; arranging the pipe gallery above the foundation pit; forming through holes in the position, opposite to the sump, of the pipe gallery; and connecting the sump with the pipe gallery. According to the sump construction method, the sump and the pipe gallery are prefabricated correspondingly, so that the whole bottom of the pipe gallery is a plane in the pipe gallery conveying process, and conveying is more convenient; the foundation pit is dug, the sump is placed in the foundation pit, and then the pipe gallery is laid; then the through holes are formed in the pipe gallery, and then the pipe gallery is connected with the sump, so that normal laying and mounting of the pipe gallery and the sump are completed.
本发明提供一种集水坑施工方法,涉及管廊安装技术领域,包括:分别预制集水坑和管廊;挖制基坑,并将集水坑置入基坑;将管廊置于基坑上方;在管廊与集水坑相对的位置上开设贯通孔;连接集水坑与管廊。本发明提供的集水坑施工方法,通过分别预制集水坑和管廊,使得在运输管廊过程中,管廊底部的整体为平面,更便于运输。通过挖设基坑,先将集水坑置入基坑内,再铺设管廊。然后在管廊上开设贯通孔,再将管廊与集水坑进行连接,以完成管廊与集水坑的正常铺设安装。
Sump construction method
The invention provides a sump construction method, and relates to the technical field of pipe gallery installation. The sump construction method comprises the following steps of correspondingly prefabricating a sump and a pipe gallery, digging a foundation pit, and arranging a sump in the foundation pit; arranging the pipe gallery above the foundation pit; forming through holes in the position, opposite to the sump, of the pipe gallery; and connecting the sump with the pipe gallery. According to the sump construction method, the sump and the pipe gallery are prefabricated correspondingly, so that the whole bottom of the pipe gallery is a plane in the pipe gallery conveying process, and conveying is more convenient; the foundation pit is dug, the sump is placed in the foundation pit, and then the pipe gallery is laid; then the through holes are formed in the pipe gallery, and then the pipe gallery is connected with the sump, so that normal laying and mounting of the pipe gallery and the sump are completed.
本发明提供一种集水坑施工方法,涉及管廊安装技术领域,包括:分别预制集水坑和管廊;挖制基坑,并将集水坑置入基坑;将管廊置于基坑上方;在管廊与集水坑相对的位置上开设贯通孔;连接集水坑与管廊。本发明提供的集水坑施工方法,通过分别预制集水坑和管廊,使得在运输管廊过程中,管廊底部的整体为平面,更便于运输。通过挖设基坑,先将集水坑置入基坑内,再铺设管廊。然后在管廊上开设贯通孔,再将管廊与集水坑进行连接,以完成管廊与集水坑的正常铺设安装。
Sump construction method
集水坑施工方法