Construction method for post-cast strip hard isolation sealing and side face water retaining ridge building
The invention provides a construction method for post-cast strip hard isolation sealing and side face water retaining ridge building. The method is characterized by comprising the following steps that a, after basement roof concrete pouring is completed, a post-cast strip construction joint is cleaned; b, bricks and masonry mortar are prepared; c, a water retaining ridge with the height of 150 mm and the width of 120 mm is built at the position 5 cm away from the edge of the post-cast strip construction joint after a wire is pulled; d, plane plate sealing is started after the water retaining ridge is built; and e, red paint and white paint are alternately sprayed on the surface of the upper portion of a formwork, for finished product protection, and reducing trampling. The construction method for post-cast strip hard isolation sealing and side face water retaining ridge building has the advantages that construction operation is easy, the manufacturing cost is low, more safety is realized, stress is more reasonable, rainwater is controlled to flow into the post-cast strip and steel bars in the post-cast strip, disordered seepage of accumulated water of the post-cast strip of a basement roof is effectively prevented, and objects falling from high altitudes are prevented.
一种后浇带硬隔离封闭、侧面挡水坎砌筑的施工方法,其特征在于包括以下步骤:a、地库顶板混凝土浇筑完成后,对后浇带施工缝处进行清理,b、准备砖块、砌筑砂浆,c、在距离后浇带施工缝边外5公分处拉线砌筑150mm高、120mm宽的挡水坎,d、挡水坎砌筑完成后开始进行平面封板,e、在模板上方表面喷涂红白相间油漆,进行成品保护,减少踩踏。本发明的后浇带硬隔离封闭、侧面挡水坎砌筑的施工方法具有施工操作简单、造价成本低、更安全、受力更为合理,控制雨水流入后浇带和后浇带里面的钢筋,有效防止地下室顶板后浇带的积水无序渗漏和预防高空坠物的优点。
Construction method for post-cast strip hard isolation sealing and side face water retaining ridge building
The invention provides a construction method for post-cast strip hard isolation sealing and side face water retaining ridge building. The method is characterized by comprising the following steps that a, after basement roof concrete pouring is completed, a post-cast strip construction joint is cleaned; b, bricks and masonry mortar are prepared; c, a water retaining ridge with the height of 150 mm and the width of 120 mm is built at the position 5 cm away from the edge of the post-cast strip construction joint after a wire is pulled; d, plane plate sealing is started after the water retaining ridge is built; and e, red paint and white paint are alternately sprayed on the surface of the upper portion of a formwork, for finished product protection, and reducing trampling. The construction method for post-cast strip hard isolation sealing and side face water retaining ridge building has the advantages that construction operation is easy, the manufacturing cost is low, more safety is realized, stress is more reasonable, rainwater is controlled to flow into the post-cast strip and steel bars in the post-cast strip, disordered seepage of accumulated water of the post-cast strip of a basement roof is effectively prevented, and objects falling from high altitudes are prevented.
一种后浇带硬隔离封闭、侧面挡水坎砌筑的施工方法,其特征在于包括以下步骤:a、地库顶板混凝土浇筑完成后,对后浇带施工缝处进行清理,b、准备砖块、砌筑砂浆,c、在距离后浇带施工缝边外5公分处拉线砌筑150mm高、120mm宽的挡水坎,d、挡水坎砌筑完成后开始进行平面封板,e、在模板上方表面喷涂红白相间油漆,进行成品保护,减少踩踏。本发明的后浇带硬隔离封闭、侧面挡水坎砌筑的施工方法具有施工操作简单、造价成本低、更安全、受力更为合理,控制雨水流入后浇带和后浇带里面的钢筋,有效防止地下室顶板后浇带的积水无序渗漏和预防高空坠物的优点。
Construction method for post-cast strip hard isolation sealing and side face water retaining ridge building
一种后浇带硬隔离封闭、侧面挡水坎砌筑的施工方法
YANG WEI (author) / LIU CHEN (author) / LI SHUAI (author) / LIN SUIHONG (author)
2021-10-08
Patent
Electronic Resource
Chinese
Retaining wall post-cast strip steel plate sealing structure and construction method
European Patent Office | 2023
|Sedimentation post-cast strip sealing construction method
European Patent Office | 2023
|European Patent Office | 2024
|Construction method for retaining wall of post-cast strip
European Patent Office | 2021
|