A platform for research: civil engineering, architecture and urbanism
Cast-in-place floor reserved hole pre-embedding device and construction method
The invention discloses a cast-in-place floor reserved hole pre-embedding device and a construction method, and relates to the field of operation construction of cast-in-place floors. The cast-in-place floor reserved hole pre-embedding device is characterized by comprising a sleeve, a lifting handle arranged at the top of the sleeve, a positioning plate arranged at the bottom of the sleeve and a positioning hole formed in the positioning plate, and the outer side of the sleeve is wrapped with a shockproof bubble bag. According to a fixing device, the problems of formwork trepanning and processing and mounting of an ultra-long fixing device are solved; and meanwhile, a concave-convex surface is formed on the surface of concrete through the shockproof bubble bag, the length of a joint between new concrete and old concrete is increased, and the leakage risk of a floor slab of a room with water is reduced.
一种现浇楼板预留洞预埋装置及施工方法。本发明涉及现浇楼板的作业施工领域,具体是一种现浇楼板预留洞预埋装置,其特征是:包括套管,设置在套管顶部的提把、设置在套管底部的定位板和开设在定位板上的定位孔,在套管的外侧包裹防震气泡袋。本发明固定装置解决了模板开孔及超长固定装置的加工及安装问题,同时,防震气泡袋使混凝土表面形成凹凸面,增加了新旧混凝土接缝长度,减轻了有水房间楼板渗漏风险。
Cast-in-place floor reserved hole pre-embedding device and construction method
The invention discloses a cast-in-place floor reserved hole pre-embedding device and a construction method, and relates to the field of operation construction of cast-in-place floors. The cast-in-place floor reserved hole pre-embedding device is characterized by comprising a sleeve, a lifting handle arranged at the top of the sleeve, a positioning plate arranged at the bottom of the sleeve and a positioning hole formed in the positioning plate, and the outer side of the sleeve is wrapped with a shockproof bubble bag. According to a fixing device, the problems of formwork trepanning and processing and mounting of an ultra-long fixing device are solved; and meanwhile, a concave-convex surface is formed on the surface of concrete through the shockproof bubble bag, the length of a joint between new concrete and old concrete is increased, and the leakage risk of a floor slab of a room with water is reduced.
一种现浇楼板预留洞预埋装置及施工方法。本发明涉及现浇楼板的作业施工领域,具体是一种现浇楼板预留洞预埋装置,其特征是:包括套管,设置在套管顶部的提把、设置在套管底部的定位板和开设在定位板上的定位孔,在套管的外侧包裹防震气泡袋。本发明固定装置解决了模板开孔及超长固定装置的加工及安装问题,同时,防震气泡袋使混凝土表面形成凹凸面,增加了新旧混凝土接缝长度,减轻了有水房间楼板渗漏风险。
Cast-in-place floor reserved hole pre-embedding device and construction method
一种现浇楼板预留洞预埋装置及施工方法
ZHENG HAI (author) / ZHU MINGXING (author) / PEI HAIQING (author) / LU ZILI (author) / TIAN SHENGQUN (author)
2021-10-08
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of reserved hole in cast-in-place floor plate
European Patent Office | 2023
|Rabbet type plugging construction method for reserved hole of cast-in-place floor
European Patent Office | 2023
|Construction method for pipe penetrating reserved hole in cast-in-place concrete floor plate
European Patent Office | 2022
|Cast-in-place wall reserved hole control structure and construction method thereof
European Patent Office | 2020
|