The invention discloses a construction method of a fabricated green building, and belongs to the field of building construction. The construction method of the fabricated green building comprises the following steps that materials are prepared, specifically, mounting columns, outer wall plates, mounting doors, windows and other components are transported to the position in front of a construction site through a transfer trolley, and then cement is stirred in advance; and the mounting columns are fixed, specifically, the mounting columns are mounted at the predetermined positions according to a drawing, the mounting columns are poured with the cement, when a worker uses a lifting appliance on a crane to be suspended with the wall plates, a lifting hook adjustable assembly on the lifting appliance replaces a flexible lifting rope, the wall plates are effectively fixed through a steel bar fixing structure on a lifting hook, shaking is avoided in the process that the worker uses the crane to assemble the wall plates, the wall plates are kept stable in the wall body assembling process, the assembling deviation between the wall plates and the mounting columns is reduced, and the actual effect of building assembling is good.
本发明公开了一种装配式绿色建筑的施工方法,属于建筑施工领域,一种装配式绿色建筑的施工方法,包括如下步骤:材料准备:通过转运车将安装柱、外墙板、墙板、安装门、窗和其他构件运输到工地前,再将水泥事先搅拌好;固定安装柱:根据图纸将安装柱安装在预定的位置,对安装柱用水泥进行浇筑,工作人员可以实现用吊机上的吊具与墙板进行悬挂时,吊具上的吊钩可调节组件替代柔性的吊绳,在通过吊钩上的钢筋固定结构将墙板进行有效的固定,在工作人员使用吊机将墙板进行装配的过程中不会产生晃动,在墙体装配过程中使其保持稳定,减小墙板与安装柱之间的装配偏差,建筑的装配的实际效果良好。
Construction method of fabricated green building
The invention discloses a construction method of a fabricated green building, and belongs to the field of building construction. The construction method of the fabricated green building comprises the following steps that materials are prepared, specifically, mounting columns, outer wall plates, mounting doors, windows and other components are transported to the position in front of a construction site through a transfer trolley, and then cement is stirred in advance; and the mounting columns are fixed, specifically, the mounting columns are mounted at the predetermined positions according to a drawing, the mounting columns are poured with the cement, when a worker uses a lifting appliance on a crane to be suspended with the wall plates, a lifting hook adjustable assembly on the lifting appliance replaces a flexible lifting rope, the wall plates are effectively fixed through a steel bar fixing structure on a lifting hook, shaking is avoided in the process that the worker uses the crane to assemble the wall plates, the wall plates are kept stable in the wall body assembling process, the assembling deviation between the wall plates and the mounting columns is reduced, and the actual effect of building assembling is good.
本发明公开了一种装配式绿色建筑的施工方法,属于建筑施工领域,一种装配式绿色建筑的施工方法,包括如下步骤:材料准备:通过转运车将安装柱、外墙板、墙板、安装门、窗和其他构件运输到工地前,再将水泥事先搅拌好;固定安装柱:根据图纸将安装柱安装在预定的位置,对安装柱用水泥进行浇筑,工作人员可以实现用吊机上的吊具与墙板进行悬挂时,吊具上的吊钩可调节组件替代柔性的吊绳,在通过吊钩上的钢筋固定结构将墙板进行有效的固定,在工作人员使用吊机将墙板进行装配的过程中不会产生晃动,在墙体装配过程中使其保持稳定,减小墙板与安装柱之间的装配偏差,建筑的装配的实际效果良好。
Construction method of fabricated green building
一种装配式绿色建筑的施工方法