A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of buildings, and particularly discloses a hammering pile for geotechnical engineering. The hammering pile comprises a pile core, wherein the upper part of the pile core is connected with a pile head, the upper end of the pile head is connected with a connecting part through a mounting part, the connecting part comprises a connecting column and a mounting block arranged at the lower end of the connecting column, the mounting part comprises a mounting part main body, a mounting groove matched with the mounting block is formed in the mounting part main body, an opening allowing the connecting column to extend out is formed in the upper end of the mounting part main body, and the mounting part main body is in threaded connection with the mounting block through a positioning bolt. According to the hammering pile, the mounting block is inserted into a mounting groove to be limited and fixed, the operation is simple and convenient, the hammering pile can be disassembled and replaced conveniently, the mounting efficiency is effectively improved, meanwhile, the mounting block and the mounting part body are in threaded connection and fixed through the positioning bolt, and the problem that an existing hammering pile cannot be replaced according to needs is solved.
本发明涉及建筑技术领域,具体公开了一种用于岩土工程的锤击桩,包括桩芯,桩芯的上部连接有桩头,所述桩头上端通过安装部与连接部连接;所述连接部包括连接柱与设置在连接柱下端的安装块;所述安装部包括安装部主体,安装部主体内开设有用于与安装块相配合的安装槽,安装部主体上端设有用于供连接柱伸出的开口,且安装部主体通过定位螺栓与安装块进行螺纹连接。本发明通过将安装块插入至安装槽内进行限位固定,简单方便,有利于对锤击桩进行拆卸更换,有效提高了安装效率,同时通过定位螺栓对安装块与安装部主体进行螺纹连接固定,解决了现有的锤击桩无法根据需要进行更换的问题。
The invention relates to the technical field of buildings, and particularly discloses a hammering pile for geotechnical engineering. The hammering pile comprises a pile core, wherein the upper part of the pile core is connected with a pile head, the upper end of the pile head is connected with a connecting part through a mounting part, the connecting part comprises a connecting column and a mounting block arranged at the lower end of the connecting column, the mounting part comprises a mounting part main body, a mounting groove matched with the mounting block is formed in the mounting part main body, an opening allowing the connecting column to extend out is formed in the upper end of the mounting part main body, and the mounting part main body is in threaded connection with the mounting block through a positioning bolt. According to the hammering pile, the mounting block is inserted into a mounting groove to be limited and fixed, the operation is simple and convenient, the hammering pile can be disassembled and replaced conveniently, the mounting efficiency is effectively improved, meanwhile, the mounting block and the mounting part body are in threaded connection and fixed through the positioning bolt, and the problem that an existing hammering pile cannot be replaced according to needs is solved.
本发明涉及建筑技术领域,具体公开了一种用于岩土工程的锤击桩,包括桩芯,桩芯的上部连接有桩头,所述桩头上端通过安装部与连接部连接;所述连接部包括连接柱与设置在连接柱下端的安装块;所述安装部包括安装部主体,安装部主体内开设有用于与安装块相配合的安装槽,安装部主体上端设有用于供连接柱伸出的开口,且安装部主体通过定位螺栓与安装块进行螺纹连接。本发明通过将安装块插入至安装槽内进行限位固定,简单方便,有利于对锤击桩进行拆卸更换,有效提高了安装效率,同时通过定位螺栓对安装块与安装部主体进行螺纹连接固定,解决了现有的锤击桩无法根据需要进行更换的问题。
Hammering pile for geotechnical engineering
一种用于岩土工程的锤击桩
XIONG CHAO (author)
2021-10-12
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Pile Driving Analysis for Top Hammering and Bottom Hammering
British Library Online Contents | 2002
|Pile Driving Analysis for Top Hammering and Bottom Hammering
Online Contents | 2002
|