A platform for research: civil engineering, architecture and urbanism
Transformer installation foundation and transformer substation
The invention discloses a transformer installation foundation and a transformer substation. The transformer installation foundation comprises the transformer substation, a plurality of installation columns are evenly arranged on the transformer substation at equal intervals, two hoops are arranged on each installation column up and down, two transverse rods are symmetrically installed at the two ends of the upper hoop, supporting inclined rods are installed at the lower ends of the two transverse rods of each installation column, the lower ends of the two supporting inclined rods are fixedly connected with the two side ends of the hoop located below, an extrusion assembly is arranged in front of the two transverse rods of each installation column, the outer ends of the two transverse rods of each installation column are symmetrically provided with tidying assemblies and transmission assemblies, and the two transmission assemblies each are connected with the tidying assembly and the extrusion assembly on the same side in a meshed mode. According to the transformer installation foundation and the transformer substation, the extrusion assemblies, positioning plates, the tidying assemblies and the transmission assemblies are additionally arranged on the transformer installation foundation, so that a transformer and the installation foundation are rapidly fixed together, first universal balls and second universal balls are arranged, and the labor-saving effect is achieved.
本发明公开了一种变压器安装基础以及变电站,包括变电站,所述变电站上均匀等间距设有若干组安装柱且所述安装柱上呈上下设有两组抱箍,位于上方所述抱箍的两端呈对称安装有两组横杆且两组所述横杆的下端均安装有支撑斜杆,两组所述支撑斜杆的下端均与位于下方设置的抱箍的两侧端固定连接,两组所述横杆之前设有挤压组件,两组所述横杆的外端呈对称设有整齐组件和传动组件,两组所述传动组件分别与同侧的整齐组件和挤压组件啮合连接。本发明所述的一种变压器安装基础以及变电站,在变压器安装基础上增设有挤压组件、定位板、整齐组件和传动组件,使得变压器快速与本安装基础固定在一起,设有第一万向滚珠、第二万向滚珠,起到省力的作用。
Transformer installation foundation and transformer substation
The invention discloses a transformer installation foundation and a transformer substation. The transformer installation foundation comprises the transformer substation, a plurality of installation columns are evenly arranged on the transformer substation at equal intervals, two hoops are arranged on each installation column up and down, two transverse rods are symmetrically installed at the two ends of the upper hoop, supporting inclined rods are installed at the lower ends of the two transverse rods of each installation column, the lower ends of the two supporting inclined rods are fixedly connected with the two side ends of the hoop located below, an extrusion assembly is arranged in front of the two transverse rods of each installation column, the outer ends of the two transverse rods of each installation column are symmetrically provided with tidying assemblies and transmission assemblies, and the two transmission assemblies each are connected with the tidying assembly and the extrusion assembly on the same side in a meshed mode. According to the transformer installation foundation and the transformer substation, the extrusion assemblies, positioning plates, the tidying assemblies and the transmission assemblies are additionally arranged on the transformer installation foundation, so that a transformer and the installation foundation are rapidly fixed together, first universal balls and second universal balls are arranged, and the labor-saving effect is achieved.
本发明公开了一种变压器安装基础以及变电站,包括变电站,所述变电站上均匀等间距设有若干组安装柱且所述安装柱上呈上下设有两组抱箍,位于上方所述抱箍的两端呈对称安装有两组横杆且两组所述横杆的下端均安装有支撑斜杆,两组所述支撑斜杆的下端均与位于下方设置的抱箍的两侧端固定连接,两组所述横杆之前设有挤压组件,两组所述横杆的外端呈对称设有整齐组件和传动组件,两组所述传动组件分别与同侧的整齐组件和挤压组件啮合连接。本发明所述的一种变压器安装基础以及变电站,在变压器安装基础上增设有挤压组件、定位板、整齐组件和传动组件,使得变压器快速与本安装基础固定在一起,设有第一万向滚珠、第二万向滚珠,起到省力的作用。
Transformer installation foundation and transformer substation
一种变压器安装基础以及变电站
DONG JINQIANG (author) / LIU CHENG (author) / XIU YITAO (author) / ZHANG FENG (author) / ZHANG QIANG (author) / LI SHUO (author) / YIN CHUNHAO (author)
2021-10-15
Patent
Electronic Resource
Chinese
Transformer substation concrete foundation evaluation method
European Patent Office | 2023
|Foundation for transformer substation in collapsible land
European Patent Office | 2016
|Prefabricated cabin for transformer substation and transformer substation
European Patent Office | 2022
|