A platform for research: civil engineering, architecture and urbanism
Machining and mounting method of buttress connecting joint with energy dissipation and adjustment functions
The invention relates to the technical field of energy dissipation and shock absorption, and discloses a machining and mounting method of a buttress connecting joint with energy dissipation and adjustment functions. The machining and mounting method comprises the following steps that an energy dissipation prefabricated wall column is manufactured in a factory; a prefabricated frame top beam and a prefabricated frame bottom beam are manufactured in the factory; the prefabricated frame bottom beam is hoisted to the ground, and connecting steel bars are exposed; the energy dissipation prefabricated wall column is hoisted to a preset position, and the energy dissipation prefabricated wall column is connected with the prefabricated frame bottom beam; the prefabricated frame top beam is hoisted to a preset position, temporary fixing angle steel is removed, adjusting screws are unscrewed, a connecting support is adjusted, grouting sleeves of prefabricated upper buttress components are connected to the connecting steel bars of the prefabricated frame top beam in a sleeving mode, and after the connecting support is adjusted to a proper position, the adjusting screws are screwed; and high-strength mortar is injected into the grouting sleeves. The machining and mounting method has the advantages that the height of the adjustable energy dissipation prefabricated wall column can be adjusted, mounting is convenient, the construction efficiency is high, the machining precision requirement is low, the application range is wide, the practicability is high, the energy dissipation and shock absorption effects are good, and hoisting is convenient.
本发明涉及消能减震技术领域,公开了一种具有消能调节功能的支墩连接节点的加工安装方法,包括如下步骤:在工厂内制作消能预制墙柱;在工厂内制作预制框架顶梁和预制框架底梁;吊运预制框架底梁至地面,露出连接钢筋;吊运消能预制墙柱至预设位置,将消能预制墙柱与预制框架底梁相连;吊运预制框架顶梁至预设位置,拆除临时固定角钢,拧松调节螺丝,调节连接支座,使预制上支墩构件的灌浆套筒套接在预制框架顶梁的连接钢筋上,调节到合适位置后,拧紧调节螺丝;往灌浆套筒注入高强砂浆。本发明具有能调整调节式消能预制墙柱的高度,安装方便,施工效率高,加工精度要求低,适用范围广,实用性强,消能减振效果好,吊运方便的优点。
Machining and mounting method of buttress connecting joint with energy dissipation and adjustment functions
The invention relates to the technical field of energy dissipation and shock absorption, and discloses a machining and mounting method of a buttress connecting joint with energy dissipation and adjustment functions. The machining and mounting method comprises the following steps that an energy dissipation prefabricated wall column is manufactured in a factory; a prefabricated frame top beam and a prefabricated frame bottom beam are manufactured in the factory; the prefabricated frame bottom beam is hoisted to the ground, and connecting steel bars are exposed; the energy dissipation prefabricated wall column is hoisted to a preset position, and the energy dissipation prefabricated wall column is connected with the prefabricated frame bottom beam; the prefabricated frame top beam is hoisted to a preset position, temporary fixing angle steel is removed, adjusting screws are unscrewed, a connecting support is adjusted, grouting sleeves of prefabricated upper buttress components are connected to the connecting steel bars of the prefabricated frame top beam in a sleeving mode, and after the connecting support is adjusted to a proper position, the adjusting screws are screwed; and high-strength mortar is injected into the grouting sleeves. The machining and mounting method has the advantages that the height of the adjustable energy dissipation prefabricated wall column can be adjusted, mounting is convenient, the construction efficiency is high, the machining precision requirement is low, the application range is wide, the practicability is high, the energy dissipation and shock absorption effects are good, and hoisting is convenient.
本发明涉及消能减震技术领域,公开了一种具有消能调节功能的支墩连接节点的加工安装方法,包括如下步骤:在工厂内制作消能预制墙柱;在工厂内制作预制框架顶梁和预制框架底梁;吊运预制框架底梁至地面,露出连接钢筋;吊运消能预制墙柱至预设位置,将消能预制墙柱与预制框架底梁相连;吊运预制框架顶梁至预设位置,拆除临时固定角钢,拧松调节螺丝,调节连接支座,使预制上支墩构件的灌浆套筒套接在预制框架顶梁的连接钢筋上,调节到合适位置后,拧紧调节螺丝;往灌浆套筒注入高强砂浆。本发明具有能调整调节式消能预制墙柱的高度,安装方便,施工效率高,加工精度要求低,适用范围广,实用性强,消能减振效果好,吊运方便的优点。
Machining and mounting method of buttress connecting joint with energy dissipation and adjustment functions
一种具有消能调节功能的支墩连接节点的加工安装方法
ZHANG CHAO (author) / YU TIANHAO (author) / WU CONGXIAO (author) / LIN RONGYUE (author)
2021-10-15
Patent
Electronic Resource
Chinese
Construction method of fabricated energy dissipation buttress connecting joint
European Patent Office | 2021
|European Patent Office | 2020
|Shock insulation support and upper buttress connecting joint and construction method thereof
European Patent Office | 2024
|Pipe gallery pipeline and steel buttress connecting structure
European Patent Office | 2022
|