PC track beam rapid turnover system and construction method thereof
The invention discloses a PC track beam rapid turnover system and a construction method thereof. According to the PC track beam rapid turnover system, a track system is laid between a beam storage area and an installation beam taking area, then a walking system is installed on the track system, the walking system is used for carrying a PC track beam, and the PC track beam is moved to the installation beam taking area from the beam storage area along the track system; track transfer of the PC track beam is achieved, the whole transfer process is convenient and fast, the safety risk is small, and the investment cost is low. And a hydraulic lifting system is installed on the walking system, so that the PC track beam can move up and down in the transferring process, and transferring is facilitated. And moreover, a PC track beam fixing device is mounted on the hydraulic lifting system, so that the PC track beam can be fixed in the transferring process, the PC track beam is prevented from rolling over or toppling over, and the transferring safety is further improved.
本发明公开了一种PC轨道梁快速周转系统及其施工方法,所述PC轨道梁快速周转系统通过在存梁区和安装取梁区之间铺设轨道系统,然后在轨道系统上安装行走系统,利用行走系统搭载PC轨道梁沿轨道系统从存梁区移动至安装取梁区,实现了PC轨道梁的轨道转运,整个转运过程方便、快捷,安全风险小、投入成本低。通过在行走系统上安装液压升降系统,可以实现PC轨道梁在转运过程中的上下移动,便于进行转运。而且,在液压升降系统上安装有PC轨道梁固定装置,可以在转运过程中对PC轨道梁进行固定,防止PC轨道梁发生侧翻或倾倒,进一步提高了转运的安全性。
PC track beam rapid turnover system and construction method thereof
The invention discloses a PC track beam rapid turnover system and a construction method thereof. According to the PC track beam rapid turnover system, a track system is laid between a beam storage area and an installation beam taking area, then a walking system is installed on the track system, the walking system is used for carrying a PC track beam, and the PC track beam is moved to the installation beam taking area from the beam storage area along the track system; track transfer of the PC track beam is achieved, the whole transfer process is convenient and fast, the safety risk is small, and the investment cost is low. And a hydraulic lifting system is installed on the walking system, so that the PC track beam can move up and down in the transferring process, and transferring is facilitated. And moreover, a PC track beam fixing device is mounted on the hydraulic lifting system, so that the PC track beam can be fixed in the transferring process, the PC track beam is prevented from rolling over or toppling over, and the transferring safety is further improved.
本发明公开了一种PC轨道梁快速周转系统及其施工方法,所述PC轨道梁快速周转系统通过在存梁区和安装取梁区之间铺设轨道系统,然后在轨道系统上安装行走系统,利用行走系统搭载PC轨道梁沿轨道系统从存梁区移动至安装取梁区,实现了PC轨道梁的轨道转运,整个转运过程方便、快捷,安全风险小、投入成本低。通过在行走系统上安装液压升降系统,可以实现PC轨道梁在转运过程中的上下移动,便于进行转运。而且,在液压升降系统上安装有PC轨道梁固定装置,可以在转运过程中对PC轨道梁进行固定,防止PC轨道梁发生侧翻或倾倒,进一步提高了转运的安全性。
PC track beam rapid turnover system and construction method thereof
一种PC轨道梁快速周转系统及其施工方法
ZHOU ZHIQIANG (author) / ZHANG XU (author) / HUANG REN (author) / YANG JIAN (author) / LI JIDONG (author) / LUO GUIJUN (author) / ZOU GUANGGENG (author) / CHEN LONG (author)
2021-10-29
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Turnover type rapid coating construction device and construction method thereof
European Patent Office | 2024
|Turnover rapid mounting and dismounting fence system and construction method thereof
European Patent Office | 2022
|