A platform for research: civil engineering, architecture and urbanism
Landscape wall construction device for environmental art design
The invention discloses a landscape wall construction device for environmental art design. The landscape wall construction device comprises a trolley body and further comprises a base used for supporting a fabricated wall body, and the trolley body is provided with a rockfall mechanism used for laying gravel, a pressing mechanism used for pressing rockfall and a carrying mechanism used for carrying the base to the rockfall. When a landscape wall is constructed, firstly, grooving is conducted on the ground through an excavator, the trolley body moves forwards along the groove edge, in the process, the rockfall is laid into the groove through the rockfall mechanism, then the gravel is flattened through the pressing mechanism, the base is carried into the groove through the carrying mechanism, then soil is manually backfilled, the base is compacted, the fabricated wall body is mounted on the base through a hoisting mechanism, so that the landscape wall is convenient to mount and construct, the labor intensity is reduced, and the efficiency is improved.
本发明公开的一种环境艺术设计用景墙施工装置,包括小车本体,还用于支撑装配式墙体的底座,所述小车本体上设有设有用于铺设碎石的落石机构,用于压紧落石的压紧机构和用于将底座搬运到落石上的搬运机构。景墙施工时,首先通过挖掘机在地面进行开槽,小车本体沿槽边前行,在此过程中落石机构将落石铺设到开槽中,之后压紧机构将碎石压平,搬运机构将底座搬运到开槽中,之后人工将泥土回填,压实底座,并通过吊装机构将装配式墙体安装在底座上,方便景墙的安装施工,降低了劳动强度,提高效率。
Landscape wall construction device for environmental art design
The invention discloses a landscape wall construction device for environmental art design. The landscape wall construction device comprises a trolley body and further comprises a base used for supporting a fabricated wall body, and the trolley body is provided with a rockfall mechanism used for laying gravel, a pressing mechanism used for pressing rockfall and a carrying mechanism used for carrying the base to the rockfall. When a landscape wall is constructed, firstly, grooving is conducted on the ground through an excavator, the trolley body moves forwards along the groove edge, in the process, the rockfall is laid into the groove through the rockfall mechanism, then the gravel is flattened through the pressing mechanism, the base is carried into the groove through the carrying mechanism, then soil is manually backfilled, the base is compacted, the fabricated wall body is mounted on the base through a hoisting mechanism, so that the landscape wall is convenient to mount and construct, the labor intensity is reduced, and the efficiency is improved.
本发明公开的一种环境艺术设计用景墙施工装置,包括小车本体,还用于支撑装配式墙体的底座,所述小车本体上设有设有用于铺设碎石的落石机构,用于压紧落石的压紧机构和用于将底座搬运到落石上的搬运机构。景墙施工时,首先通过挖掘机在地面进行开槽,小车本体沿槽边前行,在此过程中落石机构将落石铺设到开槽中,之后压紧机构将碎石压平,搬运机构将底座搬运到开槽中,之后人工将泥土回填,压实底座,并通过吊装机构将装配式墙体安装在底座上,方便景墙的安装施工,降低了劳动强度,提高效率。
Landscape wall construction device for environmental art design
一种环境艺术设计用景墙施工装置
ZHANG XIANGRONG (author) / LI LU (author)
2021-11-02
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Landscape wall construction device for environmental art design
European Patent Office | 2024
|