A platform for research: civil engineering, architecture and urbanism
Steel frame function-recoverable high-toughness composite material lateral force resisting wall
The invention provides a steel frame function-recoverable high-toughness composite material lateral force resisting wall. The steel frame function-recoverable high-toughness composite material lateral force resisting wall comprises steel frame columns, steel frame beams and a high-toughness composite material lateral force resisting wall body; a grid-shaped rectangular frame is defined by the steel frame columns and the steel frame beams; and the high-toughness composite material lateral force resisting wall body is arranged in the grids. The steel frame beams are connected with the pre-manufactured high-toughness composite material lateral force resisting wall body through oblong hole bolts, synchronous installation of the steel frame and the lateral force resisting wall body is achieved, the construction period is shortened, the replacement and maintenance requirements of the lateral force resisting wall after an earthquake can be met, and function recovery is achieved.
一种钢框架可恢复功能强韧性复合材料抗侧力墙,包括钢框架柱、钢框架梁和强韧性复合材料抗侧力墙;若干钢框架柱和若干钢框架梁围成网格型的矩形框架;强韧性复合材料抗侧力墙设置在网格内。钢框架梁与预先制作完成的强韧性复合材料抗侧力墙采用长圆孔螺栓连接,实现钢框架与抗侧力墙同步安装,缩短施工周期,可满足地震后抗侧力墙的更换及维修要求,实现功能恢复。
Steel frame function-recoverable high-toughness composite material lateral force resisting wall
The invention provides a steel frame function-recoverable high-toughness composite material lateral force resisting wall. The steel frame function-recoverable high-toughness composite material lateral force resisting wall comprises steel frame columns, steel frame beams and a high-toughness composite material lateral force resisting wall body; a grid-shaped rectangular frame is defined by the steel frame columns and the steel frame beams; and the high-toughness composite material lateral force resisting wall body is arranged in the grids. The steel frame beams are connected with the pre-manufactured high-toughness composite material lateral force resisting wall body through oblong hole bolts, synchronous installation of the steel frame and the lateral force resisting wall body is achieved, the construction period is shortened, the replacement and maintenance requirements of the lateral force resisting wall after an earthquake can be met, and function recovery is achieved.
一种钢框架可恢复功能强韧性复合材料抗侧力墙,包括钢框架柱、钢框架梁和强韧性复合材料抗侧力墙;若干钢框架柱和若干钢框架梁围成网格型的矩形框架;强韧性复合材料抗侧力墙设置在网格内。钢框架梁与预先制作完成的强韧性复合材料抗侧力墙采用长圆孔螺栓连接,实现钢框架与抗侧力墙同步安装,缩短施工周期,可满足地震后抗侧力墙的更换及维修要求,实现功能恢复。
Steel frame function-recoverable high-toughness composite material lateral force resisting wall
一种钢框架可恢复功能强韧性复合材料抗侧力墙
BAI LIANG (author) / YANG LEI (author) / WEI HUILIN (author)
2021-11-09
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Steel and Composite Shear Walls - Two High-Performance Lateral Force Resisting Systems
Springer Verlag | 2022
|European Patent Office | 2022
|Joint design method for lateral force resisting system of self-resetting steel frame
European Patent Office | 2023
|Fabricated special-shaped column steel frame-shear wall structure system with recoverable function
European Patent Office | 2023
|