A platform for research: civil engineering, architecture and urbanism
High-altitude building hanging basket capable of being efficiently spliced and stably operated
The invention discloses a high-altitude building hanging basket capable of being efficiently spliced and stably operated. The high-altitude building hanging basket comprises a bottom plate 1, a long plate 2 and a wide frame 5, the long edge and the short edge of the bottom plate 1 are correspondingly connected with the long plate 2 and the wide frame 5, a block-shaped groove 18 is formed in the lower surface of the bottom plate 1 to form a general structure of the hanging basket, and the block-shaped groove 18 can be clamped with one end of a block-shaped piece 7 subsequently; and the long plate 2 is connected to the side edge of a supporting plate 13 through a long plate connecting component 16, a process groove 3 is reserved in the long plate 2, and the long plate 2 is connected with the wide frame 5 through the supporting plate 13. The high-altitude building hanging basket capable of being efficiently spliced and stably operated can be conveniently and rapidly disassembled and assembled, the time for installing and disassembling the hanging basket is saved, then constructors can operate as soon as possible, and the construction period can be shortened; and through a series of linkage structures, the personal safety of the constructors is guaranteed in the high-altitude operation process.
本发明公开了一种高效拼接及可稳固作业的高空建筑吊篮,包括:底板1、长型板2和宽型架5,底板1的长边和短边处分别连接有长型板2和宽型架5,底板1的下表面设置有块型槽18,构成吊篮的大体结构,且块型槽18后续能与块型件7的一端卡接;长型板2通过长型板连接构件16连接于托板13的侧边,且长型板2上预留有工艺槽3,长型板2通过托板13与宽型架5进行连接。该高效拼接及可稳固作业的高空建筑吊篮能便于快速的拆装,节约了安装吊篮与拆卸吊篮的时间,进而能够使得施工人员尽快的进行作业,进而能够缩短工期,且通过一系列的联动性结构,使得施工人员在高空作业的过程中,对去人身安全进行保障。
High-altitude building hanging basket capable of being efficiently spliced and stably operated
The invention discloses a high-altitude building hanging basket capable of being efficiently spliced and stably operated. The high-altitude building hanging basket comprises a bottom plate 1, a long plate 2 and a wide frame 5, the long edge and the short edge of the bottom plate 1 are correspondingly connected with the long plate 2 and the wide frame 5, a block-shaped groove 18 is formed in the lower surface of the bottom plate 1 to form a general structure of the hanging basket, and the block-shaped groove 18 can be clamped with one end of a block-shaped piece 7 subsequently; and the long plate 2 is connected to the side edge of a supporting plate 13 through a long plate connecting component 16, a process groove 3 is reserved in the long plate 2, and the long plate 2 is connected with the wide frame 5 through the supporting plate 13. The high-altitude building hanging basket capable of being efficiently spliced and stably operated can be conveniently and rapidly disassembled and assembled, the time for installing and disassembling the hanging basket is saved, then constructors can operate as soon as possible, and the construction period can be shortened; and through a series of linkage structures, the personal safety of the constructors is guaranteed in the high-altitude operation process.
本发明公开了一种高效拼接及可稳固作业的高空建筑吊篮,包括:底板1、长型板2和宽型架5,底板1的长边和短边处分别连接有长型板2和宽型架5,底板1的下表面设置有块型槽18,构成吊篮的大体结构,且块型槽18后续能与块型件7的一端卡接;长型板2通过长型板连接构件16连接于托板13的侧边,且长型板2上预留有工艺槽3,长型板2通过托板13与宽型架5进行连接。该高效拼接及可稳固作业的高空建筑吊篮能便于快速的拆装,节约了安装吊篮与拆卸吊篮的时间,进而能够使得施工人员尽快的进行作业,进而能够缩短工期,且通过一系列的联动性结构,使得施工人员在高空作业的过程中,对去人身安全进行保障。
High-altitude building hanging basket capable of being efficiently spliced and stably operated
一种高效拼接及可稳固作业的高空建筑吊篮
SONG DOUDOU (author)
2021-11-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
High-altitude hanging basket capable of sliding in high altitude
European Patent Office | 2024
|Intelligent high-altitude building construction hanging basket
European Patent Office | 2021
|High-altitude hanging basket for house building construction
European Patent Office | 2023
|European Patent Office | 2024
|