Construction method for plugging split bolt hole of building outer wall
The invention relates to the technical field of building waterproofing, and particularly relates to a construction method for plugging a split bolt hole of a building outer wall. The construction method comprises the following steps that a wall formwork is installed, and concrete is poured; after the concrete reaches the formwork removal strength, the formwork is removed, a split bolt is taken out, and a bolt hole opening is expanded and cleaned; one end of the bolt hole is plugged through a water stop plug, a filling bag containing a foaming agent is implanted into the bolt hole, the filling bag is crushed to enable the bolt hole to be filled with the foaming agent, meanwhile, the other end of the bolt hole is plugged through a water stop plug, and internal plugging is completed; and a wall base layer on the outer side of the end of the bolt hole is coated with waterproof paint, and external plugging is completed. According to the construction method, the hole is filled with the foaming agent and the water stop plugs, the outer wall is coated with the polyurethane waterproof paint, one inner part and one outer part are plugged, and the anti-seepage quality of the outer wall is improved.
本申请涉及建筑防水的技术领域,尤其是涉及一种建筑外墙对拉螺栓孔洞封堵施工方法,包括以下步骤:安装墙体模板,浇筑混凝土;混凝土达到拆模强度后拆除模板,取出对拉螺栓,将螺栓孔洞口扩大并进行清理;将螺栓孔的一端用止水塞进行封堵,向螺栓孔内植入内含发泡剂的填充囊,破碎填充囊使发泡剂填充螺栓孔,同时将螺栓孔另一端用止水塞封堵,完成内部封堵;将螺栓孔端部外侧墙体基层上涂刷防水涂料,完成外部封堵。本申请通过孔洞内部填充发泡剂加止水塞,外墙涂刷聚氨酯防水涂料,一内一外,双重封堵,提升了外墙抗渗质量。
Construction method for plugging split bolt hole of building outer wall
The invention relates to the technical field of building waterproofing, and particularly relates to a construction method for plugging a split bolt hole of a building outer wall. The construction method comprises the following steps that a wall formwork is installed, and concrete is poured; after the concrete reaches the formwork removal strength, the formwork is removed, a split bolt is taken out, and a bolt hole opening is expanded and cleaned; one end of the bolt hole is plugged through a water stop plug, a filling bag containing a foaming agent is implanted into the bolt hole, the filling bag is crushed to enable the bolt hole to be filled with the foaming agent, meanwhile, the other end of the bolt hole is plugged through a water stop plug, and internal plugging is completed; and a wall base layer on the outer side of the end of the bolt hole is coated with waterproof paint, and external plugging is completed. According to the construction method, the hole is filled with the foaming agent and the water stop plugs, the outer wall is coated with the polyurethane waterproof paint, one inner part and one outer part are plugged, and the anti-seepage quality of the outer wall is improved.
本申请涉及建筑防水的技术领域,尤其是涉及一种建筑外墙对拉螺栓孔洞封堵施工方法,包括以下步骤:安装墙体模板,浇筑混凝土;混凝土达到拆模强度后拆除模板,取出对拉螺栓,将螺栓孔洞口扩大并进行清理;将螺栓孔的一端用止水塞进行封堵,向螺栓孔内植入内含发泡剂的填充囊,破碎填充囊使发泡剂填充螺栓孔,同时将螺栓孔另一端用止水塞封堵,完成内部封堵;将螺栓孔端部外侧墙体基层上涂刷防水涂料,完成外部封堵。本申请通过孔洞内部填充发泡剂加止水塞,外墙涂刷聚氨酯防水涂料,一内一外,双重封堵,提升了外墙抗渗质量。
Construction method for plugging split bolt hole of building outer wall
一种建筑外墙对拉螺栓孔洞封堵施工方法
GUAN LAISHENG (author) / ZHOU JIAN (author) / WANG XIN (author) / LI JIAHUI (author) / XU TAO (author)
2021-11-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Novel outer wall split bolt hole three-color polyurethane plugging process