A platform for research: civil engineering, architecture and urbanism
Coal blending bin funnel mounting method and special silo funnel connecting embedded part
The invention relates to a coal blending bin funnel mounting method. The coal blending bin funnel mounting method comprises the following steps of firstly, welding a steel structure of a silo funnel embedded part, and then arranging the steel structure of the whole embedded part along a ring beam of a coal blending bin silo by a circle; and then pouring the inner wall of the coal blending bin silo, and finally, sliding a coal blending bin funnel down to the building elevation of 16.000 m from top to bottom, wherein the upper edge of the coal blending bin funnel falls on the embedded part and is fixedly welded. The invention further provides a special silo funnel connecting embedded part for the coal blending bin funnel mounting method. A first steel plate and a second steel plate are welded into a whole at an included angle of 78.69 degrees; a screw rod is arranged on the first steel plate; and an anchor bar is fixedly connected to the second steel plate. According to the coal blending bin funnel mounting method, the embedded part and the steel structure are welded together, and the working face of the whole embedded steel structure is installed, so that the construction time of the working face is shortened, the width of the embedded part is increased, the number of the embedded parts is reduced, welding is labor-saving and labor-saving, the construction time is greatly shortened, and the utilization rate of people, materials and machines is reduced.
本发明涉及一种配煤仓漏斗安装方法,先进行筒仓漏斗预埋件的钢结构焊接,然后将整体预埋件钢结构沿配煤仓筒仓圈梁布置一周;然后浇筑配煤仓筒仓内壁,最后将配煤仓漏斗由上至下滑模至建筑标高16.000m处,配煤仓漏斗上缘落在预埋件上并焊接固定;本发明还提供了上述配煤仓漏斗安装方法专用筒仓漏斗连接预埋件,第一钢板与第二钢板以78.69°夹角焊接一体;第一钢板上设有丝杆;第二钢板上固接锚筋,本发明先将预埋件涉及钢结构焊接在一起,进行整体预埋钢结构的工作面安装,减少了工作面施工时间,预埋件宽度增大,数量减少,焊接省工省力,大大缩短了施工时间,减少了人材机使用率。
Coal blending bin funnel mounting method and special silo funnel connecting embedded part
The invention relates to a coal blending bin funnel mounting method. The coal blending bin funnel mounting method comprises the following steps of firstly, welding a steel structure of a silo funnel embedded part, and then arranging the steel structure of the whole embedded part along a ring beam of a coal blending bin silo by a circle; and then pouring the inner wall of the coal blending bin silo, and finally, sliding a coal blending bin funnel down to the building elevation of 16.000 m from top to bottom, wherein the upper edge of the coal blending bin funnel falls on the embedded part and is fixedly welded. The invention further provides a special silo funnel connecting embedded part for the coal blending bin funnel mounting method. A first steel plate and a second steel plate are welded into a whole at an included angle of 78.69 degrees; a screw rod is arranged on the first steel plate; and an anchor bar is fixedly connected to the second steel plate. According to the coal blending bin funnel mounting method, the embedded part and the steel structure are welded together, and the working face of the whole embedded steel structure is installed, so that the construction time of the working face is shortened, the width of the embedded part is increased, the number of the embedded parts is reduced, welding is labor-saving and labor-saving, the construction time is greatly shortened, and the utilization rate of people, materials and machines is reduced.
本发明涉及一种配煤仓漏斗安装方法,先进行筒仓漏斗预埋件的钢结构焊接,然后将整体预埋件钢结构沿配煤仓筒仓圈梁布置一周;然后浇筑配煤仓筒仓内壁,最后将配煤仓漏斗由上至下滑模至建筑标高16.000m处,配煤仓漏斗上缘落在预埋件上并焊接固定;本发明还提供了上述配煤仓漏斗安装方法专用筒仓漏斗连接预埋件,第一钢板与第二钢板以78.69°夹角焊接一体;第一钢板上设有丝杆;第二钢板上固接锚筋,本发明先将预埋件涉及钢结构焊接在一起,进行整体预埋钢结构的工作面安装,减少了工作面施工时间,预埋件宽度增大,数量减少,焊接省工省力,大大缩短了施工时间,减少了人材机使用率。
Coal blending bin funnel mounting method and special silo funnel connecting embedded part
配煤仓漏斗安装方法及专用筒仓漏斗连接预埋件
SUN XIAOTAO (author) / WANG GUOLIANG (author) / WANG ZHIGUANG (author)
2021-11-16
Patent
Electronic Resource
Chinese
Construction method for large inclination angle of coal silo funnel
European Patent Office | 2023
|Silo taper funnel template and manufacturing method thereof
European Patent Office | 2015
|Cast-in-place reinforced concrete silo funnel construction method
European Patent Office | 2023
|Concrete storage silo funnel structure and construction method thereof
European Patent Office | 2023
|