A platform for research: civil engineering, architecture and urbanism
The invention discloses slope protection brick carrying equipment and belongs to the technical field of carrying equipment. The slope protection brick carrying equipment comprises a pair of outer rods, inner rods are slidably connected into the opposite ends of the outer rods, the opposite ends of the two inner rods are jointly connected with a pin connector, connecting rods are arranged on the lower surfaces of the outer rods and the lower surfaces of the inner rods, the outer rods are connected with first racks through the connecting rods; the inner rods are connected with second racks through connecting rods, the first racks and the second racks are in sliding connection, and the first racks and the second racks are engaged with a displacement mechanism. The stability of the equipment is better through an arranged gantry crane structure, the equipment can be adjusted according to the width of the slopes of river channels through an arranged telescopic structure to meet river channels with different widths, and an arranged lifting structure can make up the fall of the river channels, so that the rail for transporting slope protection bricks on the equipment is horizontal, and the situation that when the rail conveys the slope protection bricks in an inclined state, the slope protection bricks quickly move downwards due to gravitational acceleration, equipment topples over or constructors are injured by the slope protection bricks is prevented.
本发明公开了一种护坡砖搬运设备,属于搬运设备技术领域,包括一对外杆,外杆相对的一端内滑动连接有内杆,且两个内杆相对的一端共同连接有销接头,所述外杆和内杆的下表面均设有连接杆,且外杆通过连接杆连接有第一齿条,内杆通过连接杆连接有第二齿条,所述第一齿条和第二齿条滑动连接,所述第一齿条和第二齿条上啮合有位移机构。通过设置的龙门吊结构使装置的稳定性更好,通过设置的伸缩结构,可以根据河道坡度的宽度而进行调节,满足不同宽度的河道,设置的升降结构可以弥补河道的落差,使装置上用于运输护坡砖的轨道处于水平,防止轨道倾斜时,坡砖时由于重力加速度导致护坡砖快速向下运动,造成设备倾倒或者护坡砖砸伤施工人员。
The invention discloses slope protection brick carrying equipment and belongs to the technical field of carrying equipment. The slope protection brick carrying equipment comprises a pair of outer rods, inner rods are slidably connected into the opposite ends of the outer rods, the opposite ends of the two inner rods are jointly connected with a pin connector, connecting rods are arranged on the lower surfaces of the outer rods and the lower surfaces of the inner rods, the outer rods are connected with first racks through the connecting rods; the inner rods are connected with second racks through connecting rods, the first racks and the second racks are in sliding connection, and the first racks and the second racks are engaged with a displacement mechanism. The stability of the equipment is better through an arranged gantry crane structure, the equipment can be adjusted according to the width of the slopes of river channels through an arranged telescopic structure to meet river channels with different widths, and an arranged lifting structure can make up the fall of the river channels, so that the rail for transporting slope protection bricks on the equipment is horizontal, and the situation that when the rail conveys the slope protection bricks in an inclined state, the slope protection bricks quickly move downwards due to gravitational acceleration, equipment topples over or constructors are injured by the slope protection bricks is prevented.
本发明公开了一种护坡砖搬运设备,属于搬运设备技术领域,包括一对外杆,外杆相对的一端内滑动连接有内杆,且两个内杆相对的一端共同连接有销接头,所述外杆和内杆的下表面均设有连接杆,且外杆通过连接杆连接有第一齿条,内杆通过连接杆连接有第二齿条,所述第一齿条和第二齿条滑动连接,所述第一齿条和第二齿条上啮合有位移机构。通过设置的龙门吊结构使装置的稳定性更好,通过设置的伸缩结构,可以根据河道坡度的宽度而进行调节,满足不同宽度的河道,设置的升降结构可以弥补河道的落差,使装置上用于运输护坡砖的轨道处于水平,防止轨道倾斜时,坡砖时由于重力加速度导致护坡砖快速向下运动,造成设备倾倒或者护坡砖砸伤施工人员。
Road arched framework slope protection brick carrying equipment
European Patent Office | 2023
|Slope protection brick for laying side slope and construction method of slope protection brick
European Patent Office | 2024
|Ecological slope protection brick and slope protection body
European Patent Office | 2022
|