A platform for research: civil engineering, architecture and urbanism
Municipal road rapid repairing structure and construction method
The invention relates to a municipal road rapid repairing structure and a construction method. The municipal road rapid repairing structure comprises a concrete pavement body and a repairing block. A repairing groove is formed in the concrete pavement body. A plurality of inverted-U-shaped steel bars are arranged at the bottom of the repairing groove, and the two ends of each steel bar are inserted into the bottom of the repairing groove. A plurality of insertion holes arranged in rows are formed in one side wall of the repairing groove. The thickness of the repairing block is equal to the distance between the upper side face of the inverted-U-shaped steel bar and the upper side face of the concrete pavement body, and a plurality of steel plates matched with the inserting holes in a one-to-one inserting mode are embedded in the repairing block. Compared with the prior art, the municipal road rapid repairing structure and the construction method have the advantages that the construction time is short, the repairing efficiency is high, the repairing effect is good, and the strength of the repaired concrete municipal road surface is high.
本发明涉及一种市政道路快速修补结构及施工方法。该市政道路快速修补结构包括混凝土路面本体以及修补块,所述混凝土路面本体上开设有修补槽,所述修补槽的底部设有若干个倒U形钢筋,所述钢筋的两端分别插装在所述修补槽底部,所述修补槽的一侧壁上设有若干个成排布置的插孔,所述修补块的厚度等于所述倒U形钢筋的上侧面与所述混凝土路面本体上侧面之间的距离,所述修补块上预埋有若干个与所述插孔一一插装配合的钢板。相比于现有技术,本发明的市政道路快速修补结构及施工方法施工时间短,修补效率高,修补效果好,修补后的混凝土市政路面强度高。
Municipal road rapid repairing structure and construction method
The invention relates to a municipal road rapid repairing structure and a construction method. The municipal road rapid repairing structure comprises a concrete pavement body and a repairing block. A repairing groove is formed in the concrete pavement body. A plurality of inverted-U-shaped steel bars are arranged at the bottom of the repairing groove, and the two ends of each steel bar are inserted into the bottom of the repairing groove. A plurality of insertion holes arranged in rows are formed in one side wall of the repairing groove. The thickness of the repairing block is equal to the distance between the upper side face of the inverted-U-shaped steel bar and the upper side face of the concrete pavement body, and a plurality of steel plates matched with the inserting holes in a one-to-one inserting mode are embedded in the repairing block. Compared with the prior art, the municipal road rapid repairing structure and the construction method have the advantages that the construction time is short, the repairing efficiency is high, the repairing effect is good, and the strength of the repaired concrete municipal road surface is high.
本发明涉及一种市政道路快速修补结构及施工方法。该市政道路快速修补结构包括混凝土路面本体以及修补块,所述混凝土路面本体上开设有修补槽,所述修补槽的底部设有若干个倒U形钢筋,所述钢筋的两端分别插装在所述修补槽底部,所述修补槽的一侧壁上设有若干个成排布置的插孔,所述修补块的厚度等于所述倒U形钢筋的上侧面与所述混凝土路面本体上侧面之间的距离,所述修补块上预埋有若干个与所述插孔一一插装配合的钢板。相比于现有技术,本发明的市政道路快速修补结构及施工方法施工时间短,修补效率高,修补效果好,修补后的混凝土市政路面强度高。
Municipal road rapid repairing structure and construction method
一种市政道路快速修补结构及施工方法
XIA YINGZHI (author) / WANG HAI'EN (author) / ZHAO DAWEI (author) / LI ZIHAO (author) / FU YONGSHENG (author) / MA GUIJIE (author) / LIN ZHANFENG (author) / LIAN SHUKAI (author)
2021-11-30
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Municipal road rapid repairing structure and construction method thereof
European Patent Office | 2022
|Municipal road rapid repairing structure and construction method thereof
European Patent Office | 2023
|