A platform for research: civil engineering, architecture and urbanism
Cast-in-place construction method of cast-in-place concrete bridge
The invention relates to a cast-in-place construction method of a cast-in-place concrete bridge, and relates to the field of bridge construction. The cast-in-place construction method comprises the following steps: S1, determining a construction scheme; S2, determining the number of pre-pressing units; S3, installing anchor rods; S4, erecting a full framing and a preset unit; S5, detecting change parameters in the construction process of the pre-pressing unit; S6, erecting a bridge cast-in-place bottom template; and S7, casting the concrete bridge in place. The method has the effect of conveniently connecting the pre-pressing units, meanwhile, the effect of ensuring firm connection of the pre-pressing units is guaranteed, operation is easy, and the efficiency in the bridge construction process is improved.
本申请涉及一种现浇混凝土桥梁的现浇施工方法,涉及桥梁施工的领域,其包括如下步骤:S1、确定施工方案;S2、确定预压单元的数量;S3、安装锚固杆;S4、架设满堂支架以及预设单元;S5、检测预压单元施工过程中的变化参数;S6、桥梁现浇底模板架设;S7、现浇混凝土桥梁。本申请具有便于对预压单元进行连接的效果,同时保证预压单元连接牢固的效果,操作简单,提升桥梁施工过程中效率。
Cast-in-place construction method of cast-in-place concrete bridge
The invention relates to a cast-in-place construction method of a cast-in-place concrete bridge, and relates to the field of bridge construction. The cast-in-place construction method comprises the following steps: S1, determining a construction scheme; S2, determining the number of pre-pressing units; S3, installing anchor rods; S4, erecting a full framing and a preset unit; S5, detecting change parameters in the construction process of the pre-pressing unit; S6, erecting a bridge cast-in-place bottom template; and S7, casting the concrete bridge in place. The method has the effect of conveniently connecting the pre-pressing units, meanwhile, the effect of ensuring firm connection of the pre-pressing units is guaranteed, operation is easy, and the efficiency in the bridge construction process is improved.
本申请涉及一种现浇混凝土桥梁的现浇施工方法,涉及桥梁施工的领域,其包括如下步骤:S1、确定施工方案;S2、确定预压单元的数量;S3、安装锚固杆;S4、架设满堂支架以及预设单元;S5、检测预压单元施工过程中的变化参数;S6、桥梁现浇底模板架设;S7、现浇混凝土桥梁。本申请具有便于对预压单元进行连接的效果,同时保证预压单元连接牢固的效果,操作简单,提升桥梁施工过程中效率。
Cast-in-place construction method of cast-in-place concrete bridge
一种现浇混凝土桥梁的现浇施工方法
BAI GUANGJUN (author) / FAN ZHIYUAN (author) / ZHANG ZHONG (author) / WEI XIANGUO (author) / XU BANGWU (author) / WANG XIUFENG (author)
2021-12-07
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Cast-in-place construction method of cast-in-place concrete bridge
European Patent Office | 2022
|European Patent Office | 2021
|Bridge cast-in-place concrete guardrail construction device
European Patent Office | 2022
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2019
|