A platform for research: civil engineering, architecture and urbanism
Traction adjusting device for integral dragging construction of bridge
The invention discloses a traction adjusting device for integral dragging construction of a bridge, which comprises a guide rail part, a supporting part, an elevation adjusting part and a bridge mounting part. The supporting part is arranged on the guide rail part in a sliding mode, the elevation adjusting part comprises a plurality of elevation adjusting devices, and the elevation adjusting devices are arranged on the supporting part and linearly distributed in the horizontal direction; the elevation adjusting device is connected with the bridge mounting part, the elevation adjusting part is used for adjusting the position of the bridge mounting part in the vertical direction, and the bridge mounting part is used for being connected with a bridge. According to the invention, the weight of the bridge directly acts on the bridge mounting part, the bridge mounting part is supported through the plurality of elevation adjusting devices, and the adjustability of a single elevation adjusting device enables the vertical position of the bridge mounting part to be adjusted through the elevation adjusting devices and the height of the bridge to be further adjusted more conveniently and reliably.
一种用于桥梁整体式拖拉施工的牵引调节装置,包括:导轨部、支撑部、高程调节部和桥梁安装部;支撑部滑动设置在导轨部上,高程调节部包括多个高程调节装置,多个高程调节装置设置在支撑部上,且多个高程调节装置在水平方向上呈直线分布;高程调节装置与桥梁安装部连接,且高程调节部用于调节桥梁安装部在竖直方向上的位置,桥梁安装部用于连接桥梁。本发明中,桥梁的重量直接作用在桥梁安装部上,通过多个高程调节装置对桥梁安装部进行支撑,单个高程调节装置的可调性,使得通过高程调节装置调节桥梁安装部的竖直位置并进一步调节桥梁高度时,更加方便可靠。
Traction adjusting device for integral dragging construction of bridge
The invention discloses a traction adjusting device for integral dragging construction of a bridge, which comprises a guide rail part, a supporting part, an elevation adjusting part and a bridge mounting part. The supporting part is arranged on the guide rail part in a sliding mode, the elevation adjusting part comprises a plurality of elevation adjusting devices, and the elevation adjusting devices are arranged on the supporting part and linearly distributed in the horizontal direction; the elevation adjusting device is connected with the bridge mounting part, the elevation adjusting part is used for adjusting the position of the bridge mounting part in the vertical direction, and the bridge mounting part is used for being connected with a bridge. According to the invention, the weight of the bridge directly acts on the bridge mounting part, the bridge mounting part is supported through the plurality of elevation adjusting devices, and the adjustability of a single elevation adjusting device enables the vertical position of the bridge mounting part to be adjusted through the elevation adjusting devices and the height of the bridge to be further adjusted more conveniently and reliably.
一种用于桥梁整体式拖拉施工的牵引调节装置,包括:导轨部、支撑部、高程调节部和桥梁安装部;支撑部滑动设置在导轨部上,高程调节部包括多个高程调节装置,多个高程调节装置设置在支撑部上,且多个高程调节装置在水平方向上呈直线分布;高程调节装置与桥梁安装部连接,且高程调节部用于调节桥梁安装部在竖直方向上的位置,桥梁安装部用于连接桥梁。本发明中,桥梁的重量直接作用在桥梁安装部上,通过多个高程调节装置对桥梁安装部进行支撑,单个高程调节装置的可调性,使得通过高程调节装置调节桥梁安装部的竖直位置并进一步调节桥梁高度时,更加方便可靠。
Traction adjusting device for integral dragging construction of bridge
一种用于桥梁整体式拖拉施工的牵引调节装置
CHEN JIANJUN (author) / WANG JINGFENG (author) / LIANG QIAO (author) / WANG HANLAN (author) / LIU HONG (author) / YUAN PENG (author) / HAN LINBING (author) / SU YAOTONG (author) / LU FEI (author) / HU ZHIHAN (author)
2021-12-10
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bridge construction method and bridge dragging traction system
European Patent Office | 2021
|Steel truss bridge dragging construction device and construction method
European Patent Office | 2024
|Integral dragging construction method for steel box basket arch bridge with arch
European Patent Office | 2024
|Dragging device and method for construction of bridge crossing railway line
European Patent Office | 2024
|