The invention relates to a joint construction process in a rubber runway, and belongs to the technical field of runway construction, and the joint construction process comprises the following steps: S1, cutting the end surfaces of two sections of rubber runway bodies at the joint to flatten the two sections of rubber runway bodies; S2, forming a fixing groove in the ground at the joint; S3, cleaning the ground in the joint, the end face of the rubber runway body and the inner wall of the fixing groove; S4, installing a plurality of tensioning mechanisms between the end faces of the two sections of rubber runway bodies in the joint so that the ends of the two sections of rubber runway bodies can be tensioned mutually; S5, forming a containing groove for a tensioning mechanism to pass through in the lower surface of the prefabricated filling strip in advance, and inserting the filling strip into the fixing groove and enabling the joint to be bonded and fixed; S6, forming a plurality of glue injection holes communicating with the containing groove in the upper surface of the filling strip in advance, and after the filling strip is fixed, injecting glue into the glue injection holes to fill the containing groove; and S7, polishing the upper surfaces of the filling strips. The joint construction process has the effect of preventing the end of the plastic runway from tilting as much as possible.
本申请涉及橡胶跑道中接缝施工工艺,属于跑道施工的技术领域,包括以下步骤:S1、对两段橡胶跑道本体在接缝处的端面进行切割,以使其平整;S2、在接缝处的地面开设固定槽;S3、对接缝内的地面、橡胶跑道本体端面和固定槽内壁进行清理;S4、将接缝内的两段橡胶跑道本体的端面之间安装若干拉紧机构,以使两段橡胶跑道本体的端部相互拉紧;S5、提前在预制好的填充条下表面开设供拉紧机构通过的容纳槽,并将填充条插入固定槽和接缝内后粘接固定;S6、提前在填充条上表面开设若干连通于容纳槽的注胶孔,填充条固定后,往注胶孔内注入胶水以将容纳槽灌满;S7、进行填充条上表面的打磨。本申请具有尽量避免塑胶跑道端部翘起的效果。
The invention relates to a joint construction process in a rubber runway, and belongs to the technical field of runway construction, and the joint construction process comprises the following steps: S1, cutting the end surfaces of two sections of rubber runway bodies at the joint to flatten the two sections of rubber runway bodies; S2, forming a fixing groove in the ground at the joint; S3, cleaning the ground in the joint, the end face of the rubber runway body and the inner wall of the fixing groove; S4, installing a plurality of tensioning mechanisms between the end faces of the two sections of rubber runway bodies in the joint so that the ends of the two sections of rubber runway bodies can be tensioned mutually; S5, forming a containing groove for a tensioning mechanism to pass through in the lower surface of the prefabricated filling strip in advance, and inserting the filling strip into the fixing groove and enabling the joint to be bonded and fixed; S6, forming a plurality of glue injection holes communicating with the containing groove in the upper surface of the filling strip in advance, and after the filling strip is fixed, injecting glue into the glue injection holes to fill the containing groove; and S7, polishing the upper surfaces of the filling strips. The joint construction process has the effect of preventing the end of the plastic runway from tilting as much as possible.
本申请涉及橡胶跑道中接缝施工工艺,属于跑道施工的技术领域,包括以下步骤:S1、对两段橡胶跑道本体在接缝处的端面进行切割,以使其平整;S2、在接缝处的地面开设固定槽;S3、对接缝内的地面、橡胶跑道本体端面和固定槽内壁进行清理;S4、将接缝内的两段橡胶跑道本体的端面之间安装若干拉紧机构,以使两段橡胶跑道本体的端部相互拉紧;S5、提前在预制好的填充条下表面开设供拉紧机构通过的容纳槽,并将填充条插入固定槽和接缝内后粘接固定;S6、提前在填充条上表面开设若干连通于容纳槽的注胶孔,填充条固定后,往注胶孔内注入胶水以将容纳槽灌满;S7、进行填充条上表面的打磨。本申请具有尽量避免塑胶跑道端部翘起的效果。
Joint construction process in rubber runway
橡胶跑道中接缝施工工艺
QI XIAOPENG (author)
2021-12-17
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Production process of environment-friendly rubber-plastic runway
European Patent Office | 2020
|Bituminous runway construction
Engineering Index Backfile | 1942
|