A platform for research: civil engineering, architecture and urbanism
Top construction road of top soil-piled mountain-shaped building and construction method of top construction road
The invention relates to a top construction road of a top soil-piled mountain-shaped building and a construction method of the top construction road, and in particular relates to the field of building construction roads. The construction method of the construction road comprises the steps of 1 determining the construction road, specifically, S1 determining the entrance and exit of the construction road; S2 determining a material distribution platform; S3 determining a construction road main line: designing the construction road on the basis of permanent road planning according to the BIM model established in the S1 and in combination with the position of the material distribution platform and a permanent road area which is finally planned and constructed, and determining a road space planning set of the construction road main line; according to the construction technology and cost indexes in the BIM model, selecting the construction road main line; S4 determining a construction road branch line; and 2 laying the material distribution platform, the construction road main line and the construction road branch line. The construction road is constructed by adopting the construction method. According to the invention, resource waste caused by road construction in the construction process of the top soil-piled mountain-shaped building can be reduced.
本申请涉及一种顶部堆土山形建筑顶部施工道路及其施工方法,尤其涉及建筑施工道路的领域,施工道路的施工方法包括以下步骤:步骤一、施工道路确定,包括:S1、确定施工道路出入口;S2、确定布料平台;S3、确定施工道路干线:根据S1中建立的BIM模型,并结合布料平台位置以及最终规划建设的永久道路区域,在永久道路规划基础上设计施工道路,确定施工道路干线的道路空间规划集;根据BIM模型中的施工技术和成本指标,选定施工道路干线;S4、确定施工道路支线;步骤二、铺设布料平台、施工道路干线和施工道路支线。施工道路采用上述施工方法建城。本申请有助于减少顶部堆土山形建筑施工过程中由施工道路造成的资源浪费。
Top construction road of top soil-piled mountain-shaped building and construction method of top construction road
The invention relates to a top construction road of a top soil-piled mountain-shaped building and a construction method of the top construction road, and in particular relates to the field of building construction roads. The construction method of the construction road comprises the steps of 1 determining the construction road, specifically, S1 determining the entrance and exit of the construction road; S2 determining a material distribution platform; S3 determining a construction road main line: designing the construction road on the basis of permanent road planning according to the BIM model established in the S1 and in combination with the position of the material distribution platform and a permanent road area which is finally planned and constructed, and determining a road space planning set of the construction road main line; according to the construction technology and cost indexes in the BIM model, selecting the construction road main line; S4 determining a construction road branch line; and 2 laying the material distribution platform, the construction road main line and the construction road branch line. The construction road is constructed by adopting the construction method. According to the invention, resource waste caused by road construction in the construction process of the top soil-piled mountain-shaped building can be reduced.
本申请涉及一种顶部堆土山形建筑顶部施工道路及其施工方法,尤其涉及建筑施工道路的领域,施工道路的施工方法包括以下步骤:步骤一、施工道路确定,包括:S1、确定施工道路出入口;S2、确定布料平台;S3、确定施工道路干线:根据S1中建立的BIM模型,并结合布料平台位置以及最终规划建设的永久道路区域,在永久道路规划基础上设计施工道路,确定施工道路干线的道路空间规划集;根据BIM模型中的施工技术和成本指标,选定施工道路干线;S4、确定施工道路支线;步骤二、铺设布料平台、施工道路干线和施工道路支线。施工道路采用上述施工方法建城。本申请有助于减少顶部堆土山形建筑施工过程中由施工道路造成的资源浪费。
Top construction road of top soil-piled mountain-shaped building and construction method of top construction road
顶部堆土山形建筑顶部施工道路及其施工方法
XU LEI (author) / WANG GEZHOU (author) / SHEN YANG (author) / ZHANG YIZHOU (author) / ZHOU ZHENQUAN (author)
2021-12-21
Patent
Electronic Resource
Chinese
Top soil-piled mountain-shaped structure construction method
European Patent Office | 2021
|Top soil-piled mountain-shaped building roof structure and method
European Patent Office | 2021
|Mountain road construction in Idaho
Engineering Index Backfile | 1906
|Road construction in Denver's mountain parks
Engineering Index Backfile | 1915
|